Komori
Tecnisco (2962) · RiskMaterialised

Capital Investment Recovery and Delivery Delay Risks

First written in FY2023. 1 of 3 entries say "Restated". Latest entry: FY2025.

3entries
3years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2023 – FY20242023: 120232024: 120242025: 12025
Same theme, other companies

Tecnisco moved to the "Worse" side of this theme in 2025, 4 years after the typical company in this theme (2021).

The whole theme swung hardest in 2020: 51 of 96 companies on the "Worse" side.

67 other companies' latest entry also says "Materialised".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 189 companies compared. The sentences above are computed from all 189.Comparing 200 of the theme's 418 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2025MaterialisedAnnual report

    「Based on future plans that appropriately estimate current market conditions and production levels, the Company examined the recoverability of the investment, reduced the carrying amount of the fixed assets to their recoverable amount, and recognized the resulting reduction of ¥1,271.201 million as an impairment loss under extraordinary losses.」

    Following an examination of investment recoverability based on market conditions and production levels, a substantial impairment loss was incurred on equipment and other assets at the three sites.
  2. FY2024RestatedAnnual report

    「There is a risk that the capacity added through capital investment may not necessarily contribute to performance. In addition, if replacement of the equipment is delayed due to aging or other factors, there is a risk that production facilities cannot be maintained at their current level.」

    The Company continues to address risks and countermeasures relating to the profitability of capital investment, equipment replacement, financing and delivery delays.
  3. FY2023First statedAnnual report

    「There is a risk that the capacity added through capital investment may not necessarily contribute to performance. In addition, if replacement of the equipment is delayed due to aging or other factors, there is a risk that production facilities cannot be maintained at their current level.」

    The Company is addressing these risks by examining investment returns, introducing general-purpose equipment and carrying out planned replacements.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
No upcoming earnings preview for Tecnisco yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Capital Investment Recovery and Delivery Delay Risks | TECNISCO,LTD. (2962) | Komori