Komori
Ichimasa Kamaboko (2904) · RiskMaterialised

Losses from the Fire at the Higashiko Plant

First written in FY2018-Q2. 3 of 3 entries say "Materialised", first in FY2018-Q2. Latest entry: FY2018.

3entries
1years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseMaterialisedFY2018-Q2 – FY20182018: 32018
Same theme, other companies
Losses and Insurance Proceeds from Fires at the Higashiko and Kansai FactoriesA theme 2 companies write about · 2 as a headwind · 0 as a tailwind

Ichimasa Kamaboko moved to the "Worse" side of this theme in 2018.

1 other company's latest entry also says "Materialised".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2018MaterialisedAnnual report

    「Losses from the fires at the company’s Higashiko Factory in December 2017 and Kansai Factory in April 2018 were recognized as extraordinary losses, while insurance proceeds received were recognized as extraordinary income.」

    In addition to the Higashiko Factory, a fire occurred at the Kansai Factory, resulting in recognition of a fire loss of ¥135.497 million and insurance proceeds of ¥201.699 million.
  2. FY2018-Q3MaterialisedAnnual report

    「Fire loss 108,362 This represents losses resulting from the fire that occurred at the company’s Higashiko Factory in December 2017, including losses from the destruction of tangible fixed assets such as machinery and inventories such as products, restoration costs and other related expenses.」

    Losses related to the Higashiko Factory fire totaled ¥108.362 million for the cumulative third quarter. The destruction of fixed assets and inventories caused by the fire, restoration costs and other expenses continued to be recognized in the results.
  3. FY2018-Q2MaterialisedAnnual report

    「Fire loss 105,200 This represents losses resulting from the fire that occurred at the company’s Higashiko Factory in December 2017, including losses from the destruction of tangible fixed assets such as machinery and inventories such as products, restoration costs and other related expenses.」

    A fire occurred at the Higashiko Factory in December 2017, and a fire loss of ¥105.2 million was recognized for the destruction of fixed assets such as machinery and inventories such as products, restoration costs and other expenses.
Moved together

"Impact of high temperatures and the lingering summer heat on seasonal product sales and mushroom market prices" moved the same way as this thread, in the same document, in 3 of its 3 moves.

3★1
  1. ★This thread
  2. 1Impact of high temperatures and the lingering summer heat on seasonal product sales and mushroom market prices3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Ichimasa Kamaboko yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Losses from the Fire at the Higashiko Plant | ICHIMASA KAMABOKO CO.,LTD. (2904) | Komori