Komori
Alfresa Holdings (2784) · InitiativeAchieved

Construction of the Tsukuba Logistics Center

First written in FY2023. 1 of 3 entries say "Advanced", first in FY2024-Q3. Latest entry: FY2024.

3entries
2years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2023AdvancedFY2024-Q3 – FY20242023: 120232024: 22024
Same theme, other companies
Construction and operation of the Tsukuba Logistics CenterA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2024AchievedAnnual report

    「In August 2023, アルフレッサ completed construction of the Tsukuba Logistics Center in Tsukuba, Ibaraki Prefecture, and began operations on 7 May 2024. As the group's largest logistics hub, with advanced logistics functions and strong disaster resilience, the center will further strengthen the system for stable supply of pharmaceuticals and other products in the Kanto region and contribute to regional healthcare.」

    Construction of the Tsukuba Logistics Center was completed, and operations began on 7 May 2024. Construction and commencement of operations at the planned logistics hub reached completion.
  2. FY2024-Q3AdvancedAnnual report

    「In December 2023, as a funding measure to help create social value, the company issued social bonds totaling ¥20 billion to finance the construction and operation of a new logistics center in Tsukuba, Ibaraki Prefecture, and a pharmaceutical manufacturing building in Ota, Gunma Prefecture.」

    Construction and operating funds for the Tsukuba Logistics Center were raised through the issuance of ¥20 billion in social bonds. The pharmaceutical manufacturing building in Ota, Gunma Prefecture, was also included.
  3. FY2023First statedAnnual report

    「Alfresa Co., Ltd. Tsukuba Logistics Center; planned investment: ¥24,668 million; amount already paid: ¥18,825 million; internal funds; construction started: February 2022; completion: May 2024」

    A logistics center is being constructed in Tsukuba, Ibaraki Prefecture, with completion scheduled for May 2024. Total planned investment is ¥24,668 million.
Moved together

"Strengthening the Production System and Strategic Investment" moved the same way as this thread, in the same document, in 2 of its 3 moves.

222★123
  1. ★This thread
  2. 1Strengthening the Production System and Strategic Investment2×
  3. 2Investment of approximately ¥120 billion over 3 years2×
  4. 3Profitability pressure on the self-medication business from lower inbound demand and labor shortages2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Alfresa Holdings yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.