- FY2024AchievedAnnual report
「In August 2023, アルフレッサ completed construction of the Tsukuba Logistics Center in Tsukuba, Ibaraki Prefecture, and began operations on 7 May 2024. As the group's largest logistics hub, with advanced logistics functions and strong disaster resilience, the center will further strengthen the system for stable supply of pharmaceuticals and other products in the Kanto region and contribute to regional healthcare.」
Construction of the Tsukuba Logistics Center was completed, and operations began on 7 May 2024. Construction and commencement of operations at the planned logistics hub reached completion. - FY2024-Q3AdvancedAnnual report
「In December 2023, as a funding measure to help create social value, the company issued social bonds totaling ¥20 billion to finance the construction and operation of a new logistics center in Tsukuba, Ibaraki Prefecture, and a pharmaceutical manufacturing building in Ota, Gunma Prefecture.」
Construction and operating funds for the Tsukuba Logistics Center were raised through the issuance of ¥20 billion in social bonds. The pharmaceutical manufacturing building in Ota, Gunma Prefecture, was also included. - FY2023First statedAnnual report
「Alfresa Co., Ltd. Tsukuba Logistics Center; planned investment: ¥24,668 million; amount already paid: ¥18,825 million; internal funds; construction started: February 2022; completion: May 2024」
A logistics center is being constructed in Tsukuba, Ibaraki Prefecture, with completion scheduled for May 2024. Total planned investment is ¥24,668 million.