ETS Group (253A) · InitiativeDroppedLatest Results presentation (2026-08-07): "Restated"
End-to-end proposal-based technical sales from design through construction
First written in FY2025-H1. 1 of 4 entries say "Dropped", first in FY2025. Latest entry: 2026-08-07.
4entries
2years
2from disclosures
How it moved
Same theme, other companies
Integrated Design-to-Maintenance Proposals Based on Safety, Technology and QualityA theme 4 companies write about · 0 as a headwind · 4 as a tailwind
1 other company's latest entry also says "Restated".
Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
- FY2025DroppedAnnual report
「We will advance the upgrading of technical capabilities and ensure construction quality, while improving efficient schedule management amid constraints on personnel and materials.」
The previous expression, “integrated proposal-based technical sales from design through construction,” does not appear in this filing. Measures for the facilities business have shifted to technical capabilities, quality, schedule management and digital utilization. - FY2025-H1First statedAnnual report
「To this end, we will focus on integrated proposal-based technical sales from design through construction.」
This is presented as a specific sales and technical measure for growing the facilities business.