Tear (2485) · TargetCapital investment plan updated

Plan to Open 4 Additional Locations

First written in FY2016-Q3. 1 of 25 entries say "Restated". Latest entry: FY2025-H1.

25entries
10years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseOtherFY2016-Q3 – FY2025-H12016: 220162017: 220172018: 120182019: 420192020: 420202021: 320212022: 320222023: 320232024: 220242025: 12025
Same theme, other companies
Strengthening the Operating Base through New Funeral Halls and ReplacementsA theme 3 companies write about · 0 as a headwind · 5 as a tailwind

0 other companies' latest entry also says "Other".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2025-H1Capital investment plan updatedAnnual report

    「Subsidiary 八光殿 東大阪鷹殿 (Note) Higashiosaka, Osaka Funeral services Funeral hall 109 72 Internal funds November 2024 April 2025 Increase in the number of funeral services」

    A plan to construct 「東大阪鷹殿」 for the subsidiary 八光殿 was added. Planned investment is ¥109 million, with construction scheduled to start in November 2024 and be completed in April 2025. An increase in the number of funeral services is expected. 「磐田見付」 for 東海典礼 was also planned with investment of ¥56 million.
  2. FY2024Capital investment plan updatedAnnual report

    「The following were the significant new major facilities as of the end of the consolidated fiscal year.」

    Plans to construct ティア神の倉, ティア春日部緑町, ティア日進香久山, ティア小田井, ティア守山吉根 and ティア門真島頭 of 八光殿 were disclosed. Completion is scheduled between October 2024 and April 2025, and an increase in the number of funeral services is expected.
  3. FY2024-Q1Addition to capital expenditure plansAnnual report

    「These facilities were approved for construction during the consolidated accounting period of the first quarter.」

    Four funeral halls were added: ティア四日市内部, ティア野田愛宕, ティア青梅河辺 and ティア鈴鹿神戸. Planned investment is ¥72 million, ¥72 million, ¥57 million and ¥72 million, respectively, with completion scheduled between March and May 2024.
  4. FY2023-Q3Addition to capital expenditure plansAnnual report

    「Company ティア豊橋往完町 (Note) Toyohashi, Aichi Funeral services Funeral hall 72 1 Borrowings July 2023 December 2023 Increase in the number of funeral services」

    A plan to construct a funeral hall at 「ティア豊橋往完町」 was added. Planned investment is ¥72 million, of which ¥1 million has already been paid. Construction is scheduled to start in July 2023 and be completed in December 2023, with an increase in the number of funeral services expected after completion.
  5. FY2023-Q2Addition to capital expenditure plansAnnual report

    「These facilities were approved for construction during the consolidated accounting period of the second quarter.」

    A plan to construct a funeral hall at 「ティア四日市羽津」 was added. Planned investment is ¥74 million, of which ¥41 million has already been paid. The project will be funded through borrowings, with construction scheduled to start in February 2023 and be completed in April 2023. An increase in the number of funeral services is expected after completion.
  6. FY2023-Q1Addition to capital expenditure plansAnnual report

    「These facilities were approved for construction during the consolidated accounting period of the first quarter.」

    「ティアせんげん台」 was added with planned investment of ¥74 million and construction scheduled to start in January 2023 and be completed in April 2023. 「ティア岡崎南」 was added with planned investment of ¥164 million and construction scheduled to start in January 2023 and be completed in June 2023.
  7. FY2022-Q3Addition to capital expenditure plansAnnual report

    「The following were the major changes during the consolidated accounting period of the third quarter to the planned construction and other projects for major facilities that were in the planning stage at the end of the previous consolidated fiscal year.」

    「ティア野田」 was added with planned investment of ¥80 million and construction scheduled to start in June 2022 and be completed in September 2022. 「ティア四日市大矢知」 was added with planned investment of ¥80 million and construction scheduled to start in July 2022 and be completed in October 2022. Both projects will be funded through borrowings, and an increase in the number of funeral services is expected after completion.
  8. FY2022-Q2Addition to capital expenditure plansAnnual report

    「These facilities were approved for construction during the consolidated accounting period of the second quarter.」

    「ティア四日市垂坂」 in Yokkaichi, Mie Prefecture, was added. Planned investment is ¥70 million, with construction scheduled to start in April 2022 and be completed in July 2022. An increase in the number of funeral services is expected after completion.
  9. FY2022-Q1Changes and additions to capital expenditure plansAnnual report

    「These facilities were approved for construction during the consolidated accounting period of the first quarter.」

    A new facility at 「ティア桑名江場」 was added. Planned investment is ¥70 million, of which ¥40 million has already been paid. Construction is scheduled to start in December 2021 and be completed in March 2022, with an increase in funeral services expected.
  10. FY2021-Q3Changes and additions to capital expenditure plansAnnual report

    「Changes were made to the amount already paid against planned investment and to the scheduled start and completion dates.」

    The plans for 「ティア新清洲」 and 「ティア豊橋高師」 were updated, and new facilities at 「ティア桶狭間」 and 「ティア御器所」 were added. Scheduled completion is July, August and October 2021, and January 2022.
  11. FY2021-Q2Capital investment plan changedAnnual report

    「The facility names, locations, and scheduled start and completion months were changed.」

    Updated the capital investment plans for ティア新清州 and ティア豊橋高師 to planned investment of ¥70 million each, with work commencing in May 2021 and completion scheduled for August.
  12. FY2021-Q1Capital investment plan changedAnnual report

    「New construction of ティア甚目寺北 was scheduled from December 2020 to February 2021, and new construction of 2 funeral halls operated by our company was scheduled from April to August 2021.」

    Updated the capital investment plans, including planned investment amounts and scheduled start and completion months, for ティア甚目寺北 and 2 funeral halls in Aichi Prefecture.
  13. FY2020Capital investment plan updatedAnnual report

    「New construction of ティア甚目寺北 was scheduled from December 2020 to March 2021, and new construction of 2 funeral halls operated by our company was scheduled from April to August 2021.」

    Described plans to relocate and build a new facility in Nishibiwajima, and plans to build ティア甚目寺北 and 2 funeral halls in Aichi Prefecture. Total planned investment was ¥341 million.
  14. FY2020-Q3Capital investment plan changed or cancelledAnnual report

    「The planned construction of a funeral hall in Osaka Prefecture and 2 funeral consultation salons in Tokyo, as well as the renovation of ティア四軒家, which had been planned at the end of the previous consolidated fiscal year, was cancelled following a review of the plans.」

    Following a review of the capital investment plans, cancelled the construction of a funeral hall in Osaka Prefecture and 2 funeral consultation salons in Tokyo, as well as the renovation of ティア四軒家. In addition, changed the planned investment amounts and scheduled start and completion months for ティア弥富東, ティア柴田 and 2 funeral halls in Aichi Prefecture.
  15. FY2020-Q2Capital investment plan changedAnnual report

    「The facility names and scheduled start and completion months were changed. The total planned investment and the scheduled start and completion months were changed. The facility names had been listed at the end of the previous consolidated fiscal year as “5 funeral halls operated by our company,” but the number was changed to 4 because ティア岡崎上地 was listed separately.」

    Updated the scheduled start and completion dates for ティア清須古城 and ティア岡崎上地, and changed the plan for 4 funeral halls in Aichi Prefecture to planned investment of ¥280 million, with work commencing in June 2020 and completion scheduled for September. The scheduled start of the renovation of ティア相生山 was also changed to April 2020.
  16. FY2020-Q1Capital investment plan changedAnnual report

    「The following details the material changes made during the cumulative first quarter to major new construction and other capital investment plans that had been under consideration at the end of the previous consolidated fiscal year.」

    Updated the capital investment plan for ティア清須古城 and ティア岡崎上地, with planned investment of ¥70 million each, work commencing in February 2020 and completion scheduled for April. Four funeral halls in Aichi Prefecture were assigned planned investment of ¥280 million, with work commencing in February 2020 and completion scheduled for August.
  17. FY2019Capital investment plan updatedAnnual report

    「The Group formulates its capital investment plans based on its location-opening plans, taking economic and industry trends into consideration.」

    Described plans from February through August 2020 for funeral halls in Aichi and Osaka prefectures, a funeral consultation salon in Tokyo and renovations of existing halls.
  18. FY2019-Q3Capital investment plan changedAnnual report

    「The following details the material changes made during the cumulative third quarter to major new construction and other capital investment plans that had been under consideration at the end of the previous consolidated fiscal year.」

    Updated the planned investment amounts, funding methods, and scheduled start and completion months for plans to build or renovate 8 funeral halls, 4 funeral consultation salons and 2 existing locations.
  19. FY2019-Q2Capital investment plan changedAnnual report

    「The following details the material changes made during the cumulative second quarter to major new construction and other capital investment plans that had been under consideration at the end of the previous consolidated fiscal year.」

    Updated the planned investment amounts, funding methods, and scheduled start and completion months for ティア焼山, ティア矢作, 11 funeral halls in Aichi Prefecture, 4 funeral consultation salons in Tokyo and the renovation of ティア名港.
  20. FY2019-Q1Capital investment plan changedAnnual report

    「The following details the material changes made during the cumulative first quarter to major new construction and other capital investment plans that had been under consideration at the end of the previous consolidated fiscal year.」

    Updated plans for 2 funeral halls in Aichi Prefecture. Planned investment was ¥71 million for each, with completion scheduled for April and May 2019.
  21. FY2018Capital investment plan updatedAnnual report

    「The major plans for new construction and renovations of property, plant and equipment as of the end of the consolidated fiscal year are as follows.」

    Described plans to build 11 funeral halls in Aichi Prefecture, 5 funeral consultation salons in Tokyo, ティア根津 and THRC, as well as renovate 4 existing halls. Completion was scheduled from 2019 through September 2020.
  22. FY2017Capital investment plan updatedAnnual report

    「The major plans for new construction and renovations of property, plant and equipment as of the end of the consolidated fiscal year are as follows.」

    Described new construction plans for 2 funeral halls, ティア下之一色 and ティア津島東. Completion was scheduled for October 2017 and April 2018, respectively, with an increase in the number of funerals conducted expected after completion.
  23. FY2017-Q2Capital investment plan changedAnnual report

    「The following details the material changes made during the cumulative second quarter to major new construction and other capital investment plans that had been under consideration at the end of the previous fiscal year.」

    For 4 new facilities, some facility names, planned investment amounts, and scheduled start and completion months were changed. Completion of the new construction plans was scheduled between May and August 2017, with an increase in the number of funerals conducted expected.
  24. FY2016RestatedAnnual report

    「The major plans for new construction and renovations of property, plant and equipment as of the end of the fiscal year are as follows.」

    Continued the construction plans for the equivalent of 3 locations in Aichi Prefecture and 1 location in the Kanto region, scheduled from December 2016 to August 2017.
  25. FY2016-Q3First statedAnnual report

    「We plan to open 3 locations in Aichi Prefecture and 1 location in the Kanto region.」

    The capital investment plan included 4 other locations scheduled between October 2016 and September 2017. The expected increase in capacity after completion was an increase in the number of funerals conducted, funded through equity financing and borrowings.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
Tear's next results are scheduled for 2026-11-13. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.