Komori
Alsok (2331) · RiskMitigated

Suspension of network, alarm equipment and service provision due to a large-scale disaster

First written in FY2018. 3 of 6 entries say "Materialised", first in FY2019-Q1. Latest entry: FY2026.

6entries
9years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseMaterialisedFY2020-Q22018: 320182019: 220192020: 020202021: 020212022: 020222023: 020232024: 020242025: 020252026: 12026
Same theme, other companies
Risk of Service Interruptions Caused by System Failures and CyberattacksA theme 412 companies write about · 425 as a headwind · 0 as a tailwind

The whole theme swung hardest in 2026: 17 of 84 companies on the "Worse" side.

24 other companies' latest entry also says "Mitigated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 190 companies compared. The sentences above are computed from all 190.Comparing 200 of the theme's 425 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2026MitigatedAnnual report

    「The Company is taking measures including developing response manuals based on its business continuity plan and disaster response regulations, stockpiling emergency supplies, establishing a nationwide agile response structure, and conducting regular education and training.」

    In response to the risk of business and service outages caused by major disasters, the Company continues to implement measures including a BCP, stockpiles, a nationwide response structure, training, and data centers and materials warehouses in eastern and western Japan.
  2. FY2020-Q2MaterialisedAnnual report

    「In addition, since September, severe natural disasters, including typhoons, have occurred one after another.」

    The Company states that natural disasters causing severe damage, including typhoons, actually occurred one after another. However, this filing does not state that the Company's network or services were disrupted.
  3. FY2019MitigatedAnnual report

    「To prepare for the occurrence of these major disasters, the Group is taking measures including developing response manuals based on its business continuity plan and disaster response regulations, stockpiling emergency supplies, establishing a nationwide agile response structure, and conducting regular education and training, drawing on expertise developed through experience. From a business continuity perspective, the Group has also established data centers at two locations in eastern and western Japan, built backup environments for critical systems, and established a backup structure based on mutual monitoring.」

    In response to the risk of network, alarm equipment and service outages caused by major disasters, the Company has established a BCP, stockpiles, training programs, a nationwide response structure, and data centers at two locations in eastern and western Japan.
  4. FY2019-Q2MaterialisedAnnual report

    「It is also necessary to pay close attention to the impact on economic activity of successive natural disasters, including the torrential rains in July 2018, major typhoons, and the 2018 Hokkaido Eastern Iburi Earthquake, as well as developments concerning the consumption tax increase.」

    The Company describes the occurrence of specific natural disasters, including the torrential rains in July 2018, major typhoons, and the 2018 Hokkaido Eastern Iburi Earthquake, and their impact on economic activity.
  5. FY2019-Q1MaterialisedAnnual report

    「There are also concerns about the impact on future economic activity of damage caused by the Northern Osaka Earthquake in June 2018 and the torrential rains in July 2018.」

    The Company describes the occurrence of specific disasters and damage, namely the Northern Osaka Earthquake and the torrential rains in July 2018. However, it does not state that the Company's network or services were disrupted.
  6. FY2018First statedAnnual report

    「If a major disaster such as a large-scale earthquake, storm or flood occurs, together with a prolonged power outage, the infrastructure including the network built by the Group may cease to function, potentially disrupting the security and other services provided by the Group.」

    Separate from system failure risk, the Company identifies network outages, damage to alarm equipment, disruptions to service provision, and repair and replacement costs caused by major disasters as risks.
Moved together

"Comprehensive Facility Management Through Group Collaboration" moved the same way as this thread, in the same document, in 2 of its 6 moves.

222222★123456
  1. ★This thread
  2. 1Comprehensive Facility Management Through Group Collaboration2×
  3. 2Strengthening and Expanding the Security Business2×
  4. 3Expansion of security-adjacent businesses (nursing care, building maintenance, etc.)2×
  5. 4Expansion of the scale and service platform of the nursing-care business2×
  6. 5Enhancement of Security Products to Meet Customer Needs2×
  7. 6Dividend Policy Balancing Shareholder Returns and Retained Earnings2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Alsok yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Suspension of network, alarm equipment and service provision due to a large-scale disaster | ALSOK CO.,LTD. (2331) | Komori