Akatsuki Eazima (1997) · RiskRestatedLatest Earnings forecast revision (2026-03-27): "Materialised"

Decline in Net Sales Due to Delays in Major Construction Projects

First written in FY2018-Q3. 6 of 12 entries say "Materialised", first in FY2018. Latest entry: 2026-03-27.

12entries
9years
1from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseMaterialisedFY2023-Q1 – FY20232018: 220182019: 120192020: 120202021: 120212022: 120222023: 420232024: 020242025: 120252026: 1
Same theme, other companies
Delayed revenue recognition due to delays in starting constructionA theme 45 companies write about · 49 as a headwind · 0 as a tailwind

Akatsuki Eazima moved to the "Worse" side of this theme in 2018, 2 years before the typical company in this theme (2020).

The whole theme swung hardest in 2026: 10 of 22 companies on the "Worse" side.

14 other companies' latest entry also says "Materialised".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 45 companies compared. The sentences above are computed from all 45.
Full recordFilings, disclosures and news, newest first
  1. 2026-03-27MaterialisedEarnings forecast revision

    「Revenue is expected to fall slightly below the previous forecast because delays to construction schedules have shifted the timing of revenue recognition and prevented the company from securing the expected level of work completed.」

    The shift in the timing of revenue recognition and shortfall in work completed caused by construction delays are cited as factors behind the downward revision to the revenue forecast.
  2. FY2025RestatedAnnual report

    「Due to circumstances beyond the company's control, the construction period may be extended, causing delivery to customers to be delayed beyond the scheduled period. This may result in differences in the timing of revenue recognition and affect the company's operating results and financial position.」

    The company continues to disclose differences in the timing of revenue recognition caused by extensions of construction periods as a risk of fluctuations in operating performance. The business performance discussion for the current fiscal year does not describe any specific occurrence of this risk.
  3. FY2023MaterialisedAnnual report

    「Due to the deterioration in the construction profit margin and differences in the timing of revenue recognition caused by the failure of the construction progress rate to increase and by extensions of construction periods and other factors, operating profit decreased 37.7% from the previous fiscal year to ¥442 million, while ordinary profit also decreased 35.4% to ¥470 million.」

    Stagnation in the construction progress rate and differences in the timing of revenue recognition due to extensions of construction periods and other factors also occurred during the full fiscal year, and are cited as factors behind decreases in operating profit and ordinary profit.
  4. FY2023-Q3MaterialisedAnnual report

    「In terms of profit and loss, the construction profit margin deteriorated, while the construction progress rate did not increase and extensions of construction periods and other factors caused differences in the timing of revenue recognition. Operating profit decreased 45.6% year on year to ¥229 million, and ordinary profit also decreased 43.7% year on year to ¥246 million.」

    The construction progress rate did not increase, and differences in the timing of revenue recognition due to extensions of construction periods and other factors also occurred during the current quarter, and are cited as factors behind decreases in operating profit and ordinary profit.
  5. FY2023-Q2MaterialisedAnnual report

    「In terms of profit and loss, the construction profit margin deteriorated, while the construction progress rate did not increase and extensions of construction periods and other factors caused differences in the timing of revenue recognition. Operating profit decreased 64.7% year on year to ¥105 million, and ordinary profit also decreased 61.6% year on year to ¥119 million.」

    The construction progress rate did not increase, and differences in the timing of revenue recognition due to extensions of construction periods and other factors also occurred during the current quarter, and are cited as factors behind decreases in revenue, operating profit and ordinary profit.
  6. FY2023-Q1MaterialisedAnnual report

    「Although the construction profit margin improved, the construction progress rate did not increase and extensions of construction periods and other factors caused differences in the timing of revenue recognition. As a result, operating profit decreased 95.9% year on year to ¥4 million, while ordinary profit also decreased 89.4% to ¥12 million.」

    The construction progress rate did not increase, and differences in the timing of revenue recognition due to extensions of construction periods and other factors actually occurred, and are cited as factors behind the substantial decreases in revenue and profit.
  7. FY2022RestatedAnnual report

    「Due to circumstances beyond the company's control, the construction period may be extended, causing delivery to customers to be delayed beyond the scheduled period. This may result in differences in the timing of revenue recognition and affect the company's operating results and financial position. As a measure to address this risk, the company works to identify problems during construction at an early stage and thoroughly manage construction work.」

    The company continues to disclose differences in the timing of revenue recognition caused by extensions of construction periods, together with measures involving the early detection of problems during construction and construction management.
  8. FY2021MitigatedAnnual report

    「Due to circumstances beyond the company's control, the construction period may be extended, causing delivery to customers to be delayed beyond the scheduled period. As the company uses both the completed-contract method and the percentage-of-completion method, this may result in differences in the timing of revenue recognition and affect the company's operating results and financial position. As a measure to address this risk, the company works to identify problems during construction at an early stage and thoroughly manage construction work.」

    The company continues to disclose the risk of differences in the timing of revenue recognition due to extensions of construction periods, identifying the early detection of problems during construction and thorough construction management as countermeasures.
  9. FY2020RestatedAnnual report

    「Due to circumstances beyond the company's control, the construction period may be extended, causing delivery to customers to be delayed beyond the scheduled period. As the company uses both the completed-contract method and the percentage-of-completion method, this may result in differences in the timing of revenue recognition and affect the company's operating results and financial position.」

    The company continues to disclose delays in delivery and revenue recognition caused by extensions of construction periods as a general risk of fluctuations in operating performance.
  10. FY2019ReframedAnnual report

    「Due to circumstances beyond the company's control, the construction period may be extended, causing delivery to customers to be delayed beyond the scheduled period. As the company uses both the completed-contract method and the percentage-of-completion method, this may result in differences in the timing of revenue recognition and affect the company's operating results and financial position.」

    The previously observed decrease in revenue due to delays in the construction periods of certain large-scale projects has been organized as a general risk that construction-period extensions may cause differences in the timing of revenue recognition.
  11. FY2018MaterialisedAnnual report

    「Revenue decreased 14.1%, or ¥1,138 million, from the previous fiscal year to ¥6,954 million, mainly due to delays in the construction periods of certain large-scale projects and other factors.」

    Delays in the construction periods of certain large-scale projects actually occurred during the full fiscal year and are cited as a factor behind the 14.1% year-on-year decrease in revenue.
  12. FY2018-Q3First statedAnnual report

    「Revenue decreased 21.8% year on year to ¥4,622 million, due to delays in the construction periods of certain large-scale projects.」

    The company explains that delays in the construction periods of certain large-scale projects actually occurred, resulting in a 21.8% year-on-year decrease in revenue.
Moved together

"Profit improvement driven by higher construction profit margins" moved the same way as this thread, in the same document, in 5 of its 12 moves.

554333★123456
  1. ★This thread
  2. 1Profit improvement driven by higher construction profit margins5×
  3. 2Growth in Operating Cash Flow and Cash Balances5×
  4. 3Asset Acquisitions and Financing Related to Solar Power Generation Equipment4×
  5. 4Shareholder Returns through Share Repurchases and Dividends3×
  6. 5Increase in net assets (increase in retained earnings)3×
  7. 6Acquisition, Sale and Valuation Losses on Investment Securities3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Akatsuki Eazima's next results are scheduled for 2026-10-09. Read the earnings preview It last moved in the Earnings forecast revision of 2026-03-27: "Materialised".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Decline in Net Sales Due to Delays in Major Construction Projects | AKATSUKI EAZIMA CO.,LTD. (1997) | Komori