Kyowanissei (1981) · FactFull-year update to order intake and carried-forward construction backlog

High order intake and carried-forward construction backlog

First written in FY2019-Q2. . Latest entry: FY2026.

26entries
9years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseOtherFY2019-Q2 – FY20262018: 12019: 420192020: 420202021: 420212022: 420222023: 420232024: 320242025: 120252026: 12026
Same theme, other companies
Changes in orders received and order backlogA theme 199 companies write about · 33 as a headwind · 143 as a tailwind

57 other companies' latest entry also says "Other".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 177 companies compared. The sentences above are computed from all 177.Comparing 200 of the theme's 224 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2026Full-year update to order intake and carried-forward construction backlogAnnual report

    「Total 18,224,823 41,870,887 60,095,710 39,384,999 20,710,711」

    Orders received totaled ¥41,871 million and the order backlog carried forward to the next period was ¥20,711 million, up from the previous year's ¥36,601 million and ¥18,225 million, respectively.
  2. FY2025Full-year update to order intake and carried-forward construction backlogAnnual report

    「Total 19,040,703 36,600,737 55,641,440 37,416,616 18,224,823」

    Orders received totaled ¥36,601 million and the order backlog carried forward to the next period was ¥18,225 million, down from the previous year's ¥37,363 million and ¥19,041 million, respectively.
  3. FY2025-H1Update of carried-forward order backlog at the interim periodAnnual report

    「We entered the new fiscal year with ¥19,040 million in orders carried forward from the previous period, up ¥1,473 million, or 8.4%, year on year.」

    The order backlog carried forward from the previous period was ¥19,040 million, a high level that was up 8.4% year on year as the new fiscal year began.
  4. FY2024Full-year update to order intake and carried-forward construction backlogAnnual report

    「Total 17,567,211 37,363,425 54,930,637 35,889,933 19,040,703」

    Orders received totaled ¥37,363 million and the order backlog carried forward to the next period was ¥19,041 million, up from the previous year's ¥35,034 million and ¥17,567 million, respectively.
  5. FY2024-Q3Update of orders received and carried-forward order backlog through the third quarterAnnual report

    「Total 17,567,211 27,429,946 44,997,158 24,755,652 20,241,505 17.6 3,554,668 26,308,650」

    Cumulative orders received through the third quarter totaled ¥27,430 million, and the order backlog carried forward to the next period was ¥20,242 million. Both orders received and the carried-forward backlog increased from the year-earlier levels of ¥25,529 million and ¥18,869 million, respectively.
  6. FY2024-Q2Second-quarter update to order intake and carried-forward construction backlogAnnual report

    「Total 17,567,211 19,045,841 36,613,052 15,557,309 21,055,742 15.1 3,187,495 16,743,134」

    Cumulative orders received through the second quarter totaled ¥19,045 million, revenue totaled ¥15,557 million, and the order backlog carried forward to the next period was ¥21,056 million. The order backlog increased from ¥17,567 million carried forward from the previous period.
  7. FY2024-Q1First-quarter update to order intake and carried-forward construction backlogAnnual report

    「Total 17,567,211 9,904,744 27,471,955 6,733,513 20,738,442 15.0 3,102,037 7,833,880」

    For the cumulative first quarter, order intake for the current period was ¥9,905 million and backlog carried forward to the next period was ¥20,738 million. Both exceeded the year-earlier figures of ¥8,405 million for order intake and ¥18,821 million for backlog carried forward to the next period, resulting in a high level of construction backlog.
  8. FY2023Full-year update to order intake and carried-forward construction backlogAnnual report

    「Total 17,006,098 35,033,842 52,039,940 34,472,729 17,567,211」

    Order intake for the current period was ¥35,034 million and backlog carried forward to the next period was ¥17,567 million. The latter exceeded the previous fiscal year's ¥17,006 million, updating the high level of order backlog.
  9. FY2023-Q3Third-quarter decline in order intake and carried-forward construction backlogAnnual report

    「Total 17,006,098 25,529,418 42,535,517 23,666,965 18,868,551 19.3 3,632,456 25,328,177」

    For the cumulative third quarter, order intake for the current period was ¥25,529 million and backlog carried forward to the next period was ¥18,869 million, both down from the year-earlier figures of ¥26,500 million for order intake and ¥19,552 million for backlog carried forward to the next period.
  10. FY2023-Q2Second-quarter update to order intake and carried-forward construction backlogAnnual report

    「Total 17,006,098 17,058,470 34,064,568 15,349,029 18,715,539 17.2 3,214,217 16,592,001」

    For the cumulative second quarter, order intake for the current period was ¥17,058 million, revenue for the current period was ¥15,349 million and backlog carried forward to the next period was ¥18,716 million. Both order intake and backlog carried forward to the next period declined year on year.
  11. FY2023-Q1First-quarter update to order intake and carried-forward construction backlog figuresAnnual report

    「Total 17,006,098 8,404,607 25,410,706 6,589,300 18,821,405 17.6 3,320,254 7,938,310」

    For the cumulative first quarter, order intake for the current period was ¥8,405 million and backlog carried forward to the next period was ¥18,821 million. Order intake declined from ¥9,413 million in the year-earlier period, while backlog carried forward to the next period exceeded the year-earlier figure of ¥18,742 million.
  12. FY2022Full-year update to order intake and carried-forward construction backlog figuresAnnual report

    「Total 16,178,259 35,011,092 51,189,351 34,244,246 17,006,098」

    Order intake for the current period was ¥35,011 million and backlog carried forward to the next period was ¥17,006 million. Order intake increased from ¥34,167 million in the previous fiscal year, and order backlog remained high.
  13. FY2022-Q3Third-quarter update to order intake and construction backlog figuresAnnual report

    「Total 16,178,259 26,500,020 42,678,279 23,126,757 19,551,522 18.8 3,674,128 24,938,313」

    For the cumulative third quarter, order intake for the current period was ¥26,500 million and backlog carried forward to the next period was ¥19,552 million, both exceeding the year-earlier figures of ¥25,200 million for order intake and ¥19,552 million for backlog carried forward to the next period.
  14. FY2022-Q2Second-quarter update to order intake and construction backlogAnnual report

    「Total 16,178,259 18,820,586 34,998,845 15,269,429 19,729,415 15.1 2,985,138 16,391,995」

    For the cumulative second quarter, order intake for the current period was ¥18,821 million and backlog carried forward to the next period was ¥19,729 million. Year on year, order intake increased 11.8% and construction backlog increased 10.2%.
  15. FY2022-Q1First-quarter update to order intake and construction backlogAnnual report

    「Total 16,178,259 9,412,935 25,591,195 6,849,057 18,742,138 14.8 2,777,086 7,763,571」

    Order intake for the current quarter was ¥9,413 million, while construction backlog was ¥18,742 million. Order intake increased year on year, whereas construction backlog declined 1.5% year on year.
  16. FY2021Full-year update to order intake and construction backlogAnnual report

    「Total 16,431,932 34,231,964 50,663,897 34,485,637 16,178,259 11.5 1,862,572 34,298,081」

    Order intake for the current period was ¥34,232 million and backlog carried forward to the next period was ¥16,178 million, both down from the previous fiscal year's order intake of ¥35,079 million and backlog carried forward to the next period of ¥16,432 million.
  17. FY2021-Q3Third-quarter decline in order intake and construction backlogAnnual report

    「Order intake for the current period was ¥25,200 million (down ¥1,255 million, or 4.7%, year on year), while construction backlog was ¥18,115 million (down ¥145 million, or 0.8%, year on year).」

    Order intake and construction backlog for the cumulative third quarter fell below the year-earlier period due to the impact of the spread of COVID-19 and other factors.
  18. FY2021-Q2Second-quarter update to order intake and construction backlogAnnual report

    「In addition to the downward trend in new detached-home starts and a decline in orders for large-scale renovation projects due to the impact of the spread of COVID-19, the number of visitors to golf courses also fell sharply for irrigation projects, resulting in planned construction being frozen or cancelled. Consequently, order intake for the current period was ¥16,836 million (down ¥1,129 million, or 6.3%, year on year), while construction backlog was ¥17,912 million (down ¥103 million, or 0.6%, year on year).」

    Due to the impact of the spread of COVID-19, order intake for the cumulative second quarter declined 6.3% year on year, while construction backlog declined 0.6%.
  19. FY2021-Q1First-quarter update to order intake and construction backlogAnnual report

    「Order intake for the current period was ¥8,991 million (down ¥524 million, or 5.5%, year on year), while construction backlog was ¥18,860 million (down ¥441 million, or 2.3%, year on year).」

    While order intake and construction backlog fell below the year-earlier period due to the impact of the spread of COVID-19, carried-forward construction backlog from the previous period remained high at ¥16,431 million as we entered the new fiscal year.
  20. FY2020Full-year update to order intake and carried-forward construction backlog figuresAnnual report

    「We entered the new fiscal year with carried-forward construction backlog from the previous period at a high level of ¥16,300 million (up ¥1,343 million, or 9.0%, from the previous fiscal year),」

    Carried-forward construction backlog from the previous period was ¥16,300 million, up 9.0% year on year, while order intake for the current period was ¥35,079 million and backlog carried forward to the next period was ¥16,431 million.
  21. FY2020-Q3Third-quarter update to order intake and carried-forward construction backlog figuresAnnual report

    「Total 16,300,929 26,456,073 42,757,003 24,495,840 18,261,162 18.7 3,419,794 25,763,519」

    For the cumulative first 3 quarters, order intake for the current period was ¥26,456 million and backlog carried forward to the next period was ¥18,261 million. Together with carried-forward backlog from the previous period of ¥16,301 million and revenue for the current period of ¥24,496 million, the high level of order backlog was updated.
  22. FY2020-Q2Second-quarter update to order intake and carried-forward construction backlogAnnual report

    「In addition to entering the new fiscal year with carried-forward construction backlog from the previous period at a high level of ¥16,300 million (up ¥1,343 million, or 9.0%, year on year), order intake for the current period remained strong at ¥17,965 million (up ¥270 million, or 1.5%, year on year).」

    For the cumulative second quarter, carried-forward construction backlog from the previous period was ¥16,300 million and order intake for the current period was ¥17,965 million, maintaining high levels above the year-earlier period. Backlog carried forward to the next period was reported at ¥18,016 million.
  23. FY2020-Q1First-quarter update to order intake and carried-forward construction backlogAnnual report

    「We entered the new fiscal year with carried-forward construction backlog from the previous period at a high level of ¥16,300 million (up ¥1,343 million, or 9.0%, year on year), while order intake for the current period also remained strong at ¥9,516 million (up ¥710 million, or 8.1%, year on year),」

    First-quarter carried-forward construction backlog from the previous period was ¥16,300 million, and order intake for the current period was ¥9,516 million, with both exceeding the year-earlier period. Backlog carried forward to the next period was also reported at ¥19,301 million.
  24. FY2019Full-year update to order intake and carried-forward construction backlog figuresAnnual report

    「Total 14,957,017 35,718,108 50,675,126 34,374,196 16,300,929」

    Order intake for the current period was ¥35,718 million, while backlog carried forward to the next period was ¥16,301 million, with order backlog remaining high.
  25. FY2019-Q3Update to order intake and carried-forward construction backlog figuresAnnual report

    「Order intake for the current period remained strong at ¥26,338 million (up ¥976 million, or 3.8%, year on year).」

    Order intake for the cumulative first 3 quarters was ¥26,338 million, up 3.8% year on year. Carried-forward construction backlog remained high at ¥18,490 million, up 16.6% year on year.
  26. FY2019-Q2First statedAnnual report

    「While entering the new fiscal year with carried-forward construction backlog from the previous period at a high level of ¥14,957 million (up ¥780 million, or 5.5%, year on year), order intake for the current period also remained strong at ¥17,695 million (up ¥1,066 million, or 6.4%, year on year). New gas facility construction, water bureau-related construction and repair work at factory facilities all remained firm. Although performance for the cumulative second quarter of the current fiscal year declined substantially in both revenue and profit year on year, carried-forward construction backlog stood at ¥18,125 million (up ¥3,301 million, or 22.3%, year on year).」

    While revenue and profit declined, order intake and carried-forward construction backlog exceeded the year-earlier period, highlighting the high level of order backlog in comparison with operating performance.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
Kyowanissei's next results are scheduled for 2026-11-12. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.