Taihei Dengyo (1968) · RiskWorsened

Risk of Nuclear Plant Shutdowns, Electricity Market Liberalization, and Project Cancellations or Postponements

First written in FY2016. 23 of 29 entries say "Restated". Latest entry: FY2026-H1.

29entries
10years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2017-Q3 – FY2023-Q12016: 320162017: 320172018: 320182019: 420192020: 320202021: 320212022: 320222023: 320232024: 320242025: 12025
Same theme, other companies

Taihei Dengyo moved to the "Worse" side of this theme in 2025, 8 years after the typical company in this theme (2017).

The whole theme swung hardest in 2023: 4 of 6 companies on the "Worse" side.

1 other company's latest entry also says "Worsened".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026-H1WorsenedAnnual report

    「It has also been pointed out that electricity supply and demand could become tight if large-scale power sources were unexpectedly shut down or if exceptionally hot weather exceeding expectations occurred, and the situation remains uncertain. While the expansion of renewable energy adoption continues, issues have also emerged, including securing balancing capacity to address weather-related output fluctuations and frequent output curtailment. Stabilizing the electricity grid as a whole is recognized as an important challenge.」

    Regarding projects and supply-demand conditions in the electricity industry, the Company identified unplanned shutdowns of large-scale power sources, exceptionally hot weather, renewable energy output fluctuations, insufficient balancing capacity and frequent output curtailment as specific risks to supply-demand balance and grid stability.
  2. FY2025-H1RestatedAnnual report

    「No new business or other risks arose during the current interim consolidated accounting period. There were also no material changes to the business and other risks described in the securities report for the previous fiscal year.」

    The Company stated that there were no new occurrences or material changes to existing risks relating to nuclear plant shutdowns, electricity liberalization and project cancellations or postponements.
  3. FY2024ReframedAnnual report

    「Planned construction work may be extended due to changes in the environment surrounding the nuclear power business, natural disasters, the status of reviews by the Nuclear Regulation Authority, additional measures required under new regulatory standards, and other factors.」

    The Company specified the previously identified risks of nuclear plant shutdowns and project cancellations as the risk of extensions to nuclear power construction work, including regulatory reviews and additional measures required under new regulatory standards.
  4. FY2024-Q3RestatedAnnual report

    「During the nine-month period ended the third quarter, there were no major risks that management recognized as potentially having a material impact on the Group’s financial position, business performance or cash flows among the matters concerning the business and accounting conditions described in this quarterly report. There were also no material changes to the business and other risks described in the annual securities report for the previous fiscal year.」

    The Company stated that there were no new occurrences or material changes to existing risks relating to nuclear plant shutdowns, electricity liberalization and project cancellations or postponements.
  5. FY2024-Q1RestatedAnnual report

    「No new business or other risks arose during the first quarter of the current consolidated cumulative period. There were also no material changes to the business and other risks described in the annual securities report for the previous fiscal year.」

    The Company stated that there were no new occurrences or material changes to existing risks relating to nuclear plant shutdowns, electricity liberalization and project cancellations or postponements.
  6. FY2023WorsenedAnnual report

    「In the electricity industry, the Group’s core business, discussions progressed on the medium- to long-term use of nuclear power, making renewable energy a primary power source and maintaining and developing balancing power needed for its large-scale introduction, and technological development toward zero-emission thermal power generation, amid tight global supply and demand for fossil fuels.」

    Regarding the risk environment in the electricity industry, the Company newly identified tight global supply and demand for fossil fuels and specified the challenges involving nuclear power, renewable energy, balancing power and zero-emission thermal power.
  7. FY2023-Q3WorsenedAnnual report

    「Amid issues involving fuel procurement and tight electricity supply and demand, the electricity industry is working to achieve both a stable power supply and carbon neutrality.」

    The Company identified fuel procurement and tight electricity supply and demand as challenges for the electricity industry and described the need to achieve both a stable power supply and carbon neutrality.
  8. FY2023-Q1RestatedAnnual report

    「The Group’s sales are highly dependent on the power generation equipment business and may be affected by trends in the electricity industry. In the power generation equipment business, if the construction or operation of a large number of power plants were cancelled or suspended due to serious accidents or disasters, sluggish growth in electricity demand, cost-cutting pressures on electric utilities resulting from electricity liberalization, or other factors, business performance could be adversely affected.」

    The Company continued to describe the same transmission channels as in the previous fiscal year for the risk that electricity liberalization and weak demand could lead to project cancellations or suspensions.
  9. FY2022RestatedAnnual report

    「In the electricity business, changes in the future energy mix, trends such as full retail liberalization and the legal separation of the transmission and distribution divisions, and changes in the circumstances of business partners involved in plant construction could affect construction execution plans and the collection of receivables.」

    The Company continued to identify as risks the effects of the energy mix, full retail liberalization, the legal separation of the transmission and distribution divisions and changes in business partners’ circumstances on construction execution and receivables collection.
  10. FY2022-Q3RestatedAnnual report

    「During the nine-month period ended the third quarter, there were no major risks that management recognized as potentially having a material impact on the Group’s financial position, business performance or cash flows among the matters concerning the business and accounting conditions described in this quarterly report. There were also no material changes to the business and other risks described in the annual securities report for the previous fiscal year.」

    The Company stated that there were no new occurrences or material changes to existing risks relating to nuclear plant shutdowns, electricity liberalization and project cancellations or postponements.
  11. FY2022-Q1RestatedAnnual report

    「The Group’s sales are highly dependent on the power generation equipment business and may be affected by trends in the electricity industry. In the power generation equipment business, if the construction or operation of a large number of power plants were cancelled or suspended due to serious accidents or disasters, sluggish growth in electricity demand, cost-cutting pressures on electric utilities resulting from electricity liberalization, or other factors, business performance could be adversely affected.」

    The Company continued to describe the same transmission channels as previously for electricity industry risks leading to nuclear plant shutdowns, electricity liberalization and project cancellations or postponements.
  12. FY2021RestatedAnnual report

    「In the electricity business, changes in the future energy mix, trends such as full retail liberalization and the legal separation of the transmission and distribution divisions, and changes in the circumstances of business partners involved in plant construction could affect construction execution plans and the collection of receivables.」

    The Company continued to identify as risks the effects of the energy mix, full retail liberalization, the legal separation of the transmission and distribution divisions and changes in business partners’ circumstances on construction execution and receivables collection.
  13. FY2021-Q3RestatedAnnual report

    「During the nine-month period ended the third quarter, there were no major risks that management recognized as potentially having a material impact on the Group’s financial position, business performance or cash flows among the matters concerning the business and accounting conditions described in this quarterly report. There were also no material changes to the business and other risks described in the annual securities report for the previous fiscal year.」

    The Company stated that there were no new occurrences or material changes to existing risks relating to nuclear plant shutdowns, electricity liberalization and project cancellations or postponements.
  14. FY2021-Q1RestatedAnnual report

    「No new business or other risks arose during the first quarter of the current consolidated cumulative period. There were also no material changes to the business and other risks described in the annual securities report for the previous fiscal year.」

    The Company stated that there were no new occurrences or material changes to existing risks relating to nuclear plant shutdowns, electricity liberalization and project cancellations or postponements.
  15. FY2020RestatedAnnual report

    「In the electricity business, changes in the future energy mix, trends such as full retail liberalization and the legal separation of the transmission and distribution divisions, and changes in the circumstances of business partners involved in plant construction could affect construction execution plans and the collection of receivables.」

    The Company continued to describe the effects of electricity liberalization, the energy mix, the legal separation of the transmission and distribution divisions and changes in business partners’ circumstances on construction execution and receivables collection as specific transmission channels for the existing electricity industry risks.
  16. FY2020-Q3RestatedAnnual report

    「The Company is also working to rebuild the systems covering power generation, transmission and distribution in preparation for the planned legal separation of the power generation and transmission divisions in April 2020.」

    The Company continued to identify the rebuilding of the electricity system for the legal separation of the power generation and transmission divisions as an ongoing challenge for the electricity industry.
  17. FY2020-Q2RestatedAnnual report

    「In the electricity industry, the Group’s core business, the Company is strengthening functions to maintain a stable power supply and quickly restore power infrastructure following large-scale outages caused by successive natural disasters. It is also working to rebuild the systems covering power generation, transmission and distribution in preparation for the planned legal separation of the power generation and transmission divisions in April 2020.」

    Regarding the environment surrounding electricity system reform, the Company continued to identify the planned legal separation of the power generation and transmission divisions in April 2020 and the rebuilding of systems from power generation through transmission and distribution as ongoing challenges.
  18. FY2020-Q1RestatedAnnual report

    「The Group’s sales are highly dependent on the power generation equipment business and may be affected by trends in the electricity industry. In the power generation equipment business, if the construction or operation of a large number of power plants were cancelled or suspended due to serious accidents, sluggish growth in electricity demand, cost-cutting pressures on electric utilities resulting from electricity liberalization, or other factors, business performance could be adversely affected.」

    The Company continued to explicitly identify the risk that electricity liberalization, sluggish electricity demand and serious accidents could lead to the cancellation or suspension of power plant construction.
  19. FY2019RestatedAnnual report

    「The Group’s sales are highly dependent on the power generation equipment business and may be affected by trends in the electricity industry. In the power generation equipment business, if the construction or operation of a large number of power plants were cancelled or suspended due to serious accidents, sluggish growth in electricity demand, cost-cutting pressures on electric utilities resulting from electricity liberalization, or other factors, business performance could be adversely affected.」

    The Company continued to explicitly identify the risk that electricity liberalization, sluggish electricity demand and serious accidents could lead to project cancellations or suspensions.
  20. FY2019-Q3RestatedAnnual report

    「The Group’s sales are highly dependent on the power generation equipment business and may be affected by trends in the electricity industry. In the power generation equipment business, if the construction or operation of a large number of power plants were cancelled or suspended due to serious accidents, sluggish growth in electricity demand, cost-cutting pressures on electric utilities resulting from electricity liberalization, or other factors, business performance could be adversely affected.」

    The Company continued to explicitly identify the risk that electricity liberalization, sluggish electricity demand and serious accidents could lead to the cancellation or suspension of power plant construction.
  21. FY2019-Q2RestatedAnnual report

    「The Group’s sales are highly dependent on the power generation equipment business and may be affected by trends in the electricity industry. In the power generation equipment business, if the construction or operation of a large number of power plants were cancelled or suspended due to serious accidents, sluggish growth in electricity demand, cost-cutting pressures on electric utilities resulting from electricity liberalization, or other factors, business performance could be adversely affected.」

    The Company continued to explicitly identify the risk that electricity liberalization, sluggish electricity demand and serious accidents could lead to the cancellation or suspension of power plant construction.
  22. FY2019-Q1RestatedAnnual report

    「The Group’s sales are highly dependent on the power generation equipment business and may be affected by trends in the electricity industry. In the power generation equipment business, if the construction or operation of a large number of power plants were cancelled or suspended due to serious accidents, sluggish growth in electricity demand, cost-cutting pressures on electric utilities resulting from electricity liberalization, or other factors, business performance could be adversely affected.」

    The Company continued to explicitly identify the risk that electricity liberalization, sluggish electricity demand and serious accidents could lead to the cancellation or suspension of power plant construction.
  23. FY2018-Q3RestatedAnnual report

    「No new business or other risks arose during the cumulative third quarter under review. In addition, there have been no material changes to the business and other risks described in the annual securities report for the previous fiscal year.」

    The Company stated that there were no new occurrences or material changes to existing risks relating to nuclear plant shutdowns, electricity liberalization and project cancellations or postponements.
  24. FY2018-Q2RestatedAnnual report

    「During the first six months of the current consolidated fiscal year, there were no newly arising business or other risks. In addition, there were no material changes to the business and other risks described in the annual securities report for the previous fiscal year.」

    The Company stated that there were no material changes to existing risks relating to nuclear plant shutdowns, electricity liberalization and project cancellations or postponements.
  25. FY2018-Q1RestatedAnnual report

    「The electricity industry, in which the Group’s core business operates, is entering a new era of competition across energy sectors following the full liberalization of gas retailing. It is also addressing major challenges, including the establishment of a baseload power market and efforts to restore confidence in nuclear power plants.」

    The Company reconfirmed the inter-energy competition resulting from full gas retail liberalization and identified the baseload power market and restoring confidence in nuclear power plants as challenges for the electricity industry.
  26. FY2017-Q3RestatedAnnual report

    「The electricity industry, in which the Group’s core business operates, faces many challenges in further advancing electricity system reform, including designing systems to ensure a balance between electricity supply and demand and maintain stable supply, and determining how decommissioning costs should be borne. In addition, as gas retailing will be fully liberalized this year, there are concerns that more businesses will enter the electricity and gas industries, further intensifying competition among them.」

    While maintaining its concern over intensifying competition resulting from electricity and gas retail liberalization, the Company also identified challenges in electricity system reform, including supply-demand balance, system design for stable supply and the burden of decommissioning costs.
  27. FY2017-Q2WorsenedAnnual report

    「As gas retailing will also be liberalized next year, there are concerns that more businesses will enter the electricity and gas industries, further intensifying competition among them.」

    In addition to electricity retail liberalization, the Company identified gas retail liberalization and expressed concern about increased market entry into the electricity and gas industries and intensifying competition.
  28. FY2017-Q1RestatedAnnual report

    「The electricity industry, in which the Group’s core business operates, is expected to remain challenging, following the full liberalization of electricity retailing, competition among electricity companies, including new power providers, for customers, the need for a stable power supply, and efforts to reduce greenhouse gas emissions.」

    The Company described the start of full liberalization of electricity retailing and competition among electricity companies as continuing risk factors in the business environment for its core business.
  29. FY2016First statedAnnual report

    「In addition to the prolonged shutdown of nuclear power plants, rising fuel costs at replacement thermal power plants have put pressure on corporate earnings, prompting thorough management efficiency initiatives. The cancellation or postponement of construction projects could therefore have a material impact on the Group’s business activities.」

    The Company identified prolonged nuclear plant shutdowns, fuel costs for replacement thermal power plants and customers’ efficiency initiatives as factors contributing to a decline in projects.
Moved together

"Downside risk to earnings from rapid yen appreciation and global economic uncertainty" moved the same way as this thread, in the same document, in 4 of its 29 moves.

422★123
  1. ★This thread
  2. 1Downside risk to earnings from rapid yen appreciation and global economic uncertainty4×
  3. 2Construction Cost Estimation Risk Related to the Percentage-of-Completion Method and Provisions for Losses on Construction Contracts2×
  4. 3Expanding Renewable Energy Adoption and Achieving an Optimal Energy Mix2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Taihei Dengyo yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Risk of Nuclear Plant Shutdowns, Electricity Market Liberalization, and Project Cancellations or Postponements | TAIHEI DENGYO KAISHA,LTD. (1968) | Komori