Financing for the Construction of the Nishikaze Shinto Biomass Power Plant

First written in FY2018. 9 of 12 entries say "Restated". Latest entry: FY2023-Q3.

12entries
6years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2018 – FY2019-Q3RestatedFY2020-Q1 – FY2020-Q2AdvancedFY2020RestatedFY2022-Q1 – FY2023-Q32018: 320182019: 420192020: 120202021: 120212022: 220222023: 1
Same theme, other companies
Syndicated loan financing for construction of the Seifu Shinto Biomass Power PlantA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2023-Q3RestatedAnnual report

    「In connection with financing for construction costs for the Nishikaze Shinto Biomass Power Plant, the company entered into a committed syndicated loan agreement with 2 relationship banks, drew the full ¥5 billion loan limit and is currently making repayments.」

    For construction financing for the Nishikaze Shinto Biomass Power Plant, the company drew borrowings up to the ¥5 billion loan limit and continues to report that the borrowings are being repaid.
  2. FY2023-Q1RestatedAnnual report

    「In connection with financing for construction costs for the Nishikaze Shinto Biomass Power Plant, the company entered into a committed syndicated loan agreement with 2 relationship banks, drew the full ¥5 billion loan limit and is currently making repayments.」

    For construction financing for the Nishikaze Shinto Biomass Power Plant, the company drew borrowings up to the ¥5 billion loan limit and continues to report that the borrowings are currently being repaid.
  3. FY2022RestatedAnnual report

    「In connection with financing for construction costs for the Nishikaze Shinto Biomass Power Plant, the company entered into a committed syndicated loan agreement with 2 relationship banks, drew the full ¥5 billion loan limit and is currently making repayments.」

    For construction financing for the Nishikaze Shinto Biomass Power Plant, the company drew ¥5 billion in borrowings and continues to report that the borrowings are being repaid.
  4. FY2022-Q1RestatedAnnual report

    「In connection with financing for construction costs for the Nishikaze Shinto Biomass Power Plant, the company entered into a committed syndicated loan agreement with 2 relationship banks, drew the full ¥5 billion loan limit and is currently making repayments.」

    For construction financing for the Nishikaze Shinto Biomass Power Plant, the company drew borrowings up to the ¥5 billion loan limit and continues to report that the borrowings are being repaid.
  5. FY2020AdvancedAnnual report

    「In connection with financing for construction costs for the Nishikaze Shinto Biomass Power Plant, the company entered into a committed syndicated loan agreement with 2 relationship banks, drew the full ¥5 billion loan limit and is currently making repayments.」

    For biomass power plant construction financing, the company drew borrowings up to the ¥5 billion loan limit and moved from the financing-planning stage to the borrowing and repayment stage.
  6. FY2020-Q2RestatedAnnual report

    「The company plans to finance capital investment needs, including construction costs for the Nishikaze Shinto Biomass Power Plant, through internal funds and long-term borrowings. In connection with financing for the Nishikaze Shinto Biomass Power Plant, the company entered into a ¥5 billion committed syndicated loan agreement with 2 relationship banks.」

    For construction financing for the Nishikaze Shinto Biomass Power Plant, the company continues to list internal funds, long-term borrowings and a ¥5 billion committed syndicated loan with 2 relationship banks as sources of funding.
  7. FY2020-Q1RestatedAnnual report

    「The company plans to finance capital investment needs, including construction costs for the Nishikaze Shinto Biomass Power Plant, through internal funds and long-term borrowings. In connection with financing for the Nishikaze Shinto Biomass Power Plant, the company entered into a ¥5 billion committed syndicated loan agreement with 2 relationship banks.」

    For construction financing for the Nishikaze Shinto Biomass Power Plant, the company continues to list internal funds, long-term borrowings and a ¥5 billion committed syndicated loan with 2 banks as sources of funding.
  8. FY2019AdvancedAnnual report

    「In connection with financing for construction costs for the Nishikaze Shinto Biomass Power Plant, the company entered into a ¥5 billion committed syndicated loan agreement with 2 relationship banks.」

    The company maintained a ¥5 billion syndicated loan facility for biomass power plant construction financing, and borrowings outstanding at the end of the current consolidated fiscal year increased from ¥1.6 billion to ¥3.6 billion.
  9. FY2019-Q3RestatedAnnual report

    「In connection with financing for the Nishikaze Shinto Biomass Power Plant, the company entered into a ¥5 billion committed syndicated loan agreement with 2 relationship banks.」

    For construction financing for the Nishikaze Shinto Biomass Power Plant, the company continues to use a ¥5 billion committed syndicated loan with 2 relationship banks as a source of funding.
  10. FY2019-Q2RestatedAnnual report

    「In connection with financing for the Nishikaze Shinto Biomass Power Plant, the company entered into a ¥5 billion committed syndicated loan agreement with 2 relationship banks.」

    For construction financing for the Nishikaze Shinto Biomass Power Plant, the company continues to use a ¥5 billion committed syndicated loan with 2 relationship banks as a source of funding.
  11. FY2019-Q1RestatedAnnual report

    「In connection with financing for the Nishikaze Shinto Biomass Power Plant, the company entered into a ¥5 billion committed syndicated loan agreement with 2 relationship banks.」

    For construction financing for the Nishikaze Shinto Biomass Power Plant, the company again identifies a ¥5 billion committed syndicated loan with 2 relationship banks as a source of funding.
  12. FY2018First statedAnnual report

    「In connection with financing for the Nishikaze Shinto Biomass Power Plant, the company entered into a ¥5 billion committed syndicated loan agreement with 2 relationship banks.」

    Construction financing for the company-owned biomass power plant is being obtained through internal funds, long-term borrowings and a ¥5 billion committed syndicated loan with 2 relationship banks.
Moved together

"Strengthening production capacity, alliances and specialist organizations to support an integrated operating structure" moved the same way as this thread, in the same document, in 2 of its 12 moves.

222222★123456
  1. ★This thread
  2. 1Strengthening production capacity, alliances and specialist organizations to support an integrated operating structure2×
  3. 2Development of Group-Wide Risk Management, Internal Controls and Business Continuity Framework2×
  4. 3Research and Development of Technologies to Improve Construction Efficiency and Safety and Expand into New Fields2×
  5. 4Performance-Linked Share Compensation Plan for Directors (BIP Trust)2×
  6. 5Strategic Shareholdings Held to Strengthen Business Relationships and Secure Stable Financing2×
  7. 6Expanding Renewable Energy Adoption and Achieving an Optimal Energy Mix2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Taihei Dengyo yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Financing for the Construction of the Nishikaze Shinto Biomass Power Plant | TAIHEI DENGYO KAISHA,LTD. (1968) | Komori