Construction delays and lower project profitability caused by labor shortages and wage inflation
First written in FY2020. 1 of 2 entries say "Restated". Latest entry: FY2023.
2entries
4years
0from disclosures
How it moved
Same theme, other companies
Deteriorating profitability due to labor and equipment/material supply constraints and difficulty passing through costs in the construction industryA theme 50 companies write about · 53 as a headwind · 0 as a tailwind
The whole theme swung hardest in 2022: 28 of 41 companies on the "Worse" side.
19 other companies' latest entry also says "Restated".
Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 50 companies compared. The sentences above are computed from all 50.Full recordFilings, disclosures and news, newest first
- FY2023RestatedAnnual report
「モジュール工法を採用し現地工事を最小化するほか、現地建設工事に豊富な実績を有する企業と協業する等により、リスクの低減に努めております。」
工事従事者不足・賃金高騰リスクと、労働力動向のモニタリング、モジュール工法、現地企業との協業による対応を引き続き記載している。 - FY2020First statedAnnual report
「総合エンジニアリング事業においては、プラント建設地において工事従事者が不足した場合、工事従事者の賃金が高騰した場合には、建設工事の遅延および建設工事費用の増加によりプロジェクトの採算が悪化し、当社グループの事業および経営成績等に影響を与える可能性があります。」
建設労働力不足・賃金高騰を独立したリスクとして明示し、労働力動向の予測、モジュール工法、現地企業との協業を対策として挙げている。