Jgc Holdings (1963) · InitiativeAdvanced

Participation in a Ghana offshore floating facility ownership and chartering business to acquire offshore expertise and know-how

First written in FY2018-Q3. 8 of 10 entries say "Advanced", first in FY2020. Latest entry: FY2027-H1.

10entries
9years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2018-Q3 – FY2018AdvancedFY2020 – FY2027-H12018: 220182019: 020192020: 120202021: 020212022: 220222023: 220232024: 020242025: 020252026: 32026
Same theme, other companies
Participation in the Ghana Offshore FPSO Ownership and Chartering BusinessA theme 3 companies write about · 0 as a headwind · 3 as a tailwind

0 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2027-H1AdvancedAnnual report

    「The Company formally decided to bring into effect the EPC contract for Phase 2 of the LNG Canada expansion project for LNG Canada in Canada. In addition, it began developing a standard package with Honeywell of the United States, the process licensor. The package is intended to improve design efficiency and accelerate project execution and delivery for FLNG projects, and is scheduled for completion during fiscal 2026.」

    In the FLNG and large-scale LNG sectors, the Company decided to bring the EPC contract for Phase 2 of the LNG Canada expansion project into effect and began developing a standard package with Honeywell to improve design efficiency and accelerate execution.
  2. FY2023AdvancedAnnual report

    「1. The Company is conducting an economic study of zeolite membranes for separating and recovering CO2, including a comparison with existing alternative technologies. The aim is to efficiently separate high-concentration CO2 on floating offshore oil production, storage and offloading facilities and reinject it under the seabed. 2. To achieve remote and unmanned operation of offshore production facilities, the Company is conducting pilot operations of a system for remotely monitoring operating conditions and examining how digital technologies related to automation, labor saving and remote operation can be deployed.」

    In the offshore sector, an economic study of CO2 separation and recovery on floating facilities and pilot operations of a monitoring system for remote and unmanned operation progressed.
  3. FY2023-Q3AdvancedAnnual report

    「The Company received an order for construction of a nearshore FLNG plant for Malaysia's national oil company, Petronas, as well as orders for front-end engineering design services related to the expansion of the Cameron LNG plant in the United States and for front-end engineering design services for an FLNG plant in Nigeria.」

    In the floating LNG sector, additional orders were received for nearshore FLNG construction in Malaysia and design services in the United States and Nigeria.
  4. FY2022AdvancedAnnual report

    「The company established the conceptual design for a new type of FLNG hull that repurposes the LNG storage tanks of existing LNG carriers and obtained Approval in Principle (AIP) from the American Bureau of Shipping.」

    In the floating LNG sector, the Company established a conceptual design for a new-form FLNG hull and obtained basic design approval from a classification society.
  5. FY2022-Q3AdvancedAnnual report

    「During the cumulative nine-month consolidated period, in the Energy Solutions business, we received an order for conceptual engineering services for a floating LNG production facility in Nigeria and orders including basic engineering services for a floating LNG production facility in Malaysia.」

    In the offshore and floating LNG sectors, specific design service orders in Nigeria and Malaysia were disclosed, indicating continued accumulation of expertise and execution experience.
  6. FY2020AdvancedAnnual report

    「The Company is developing a low-cost, short-lead-time FLNG concept by leveraging its experience in the design, procurement, construction, installation and commissioning (EPCIC) of 2 FLNG projects currently under execution. The concept was selected as a project theme under the Ministry of Land, Infrastructure, Transport and Tourism's technology advancement R&D program related to offshore resource development for fiscal 2019.」

    Development of a low-cost, short-lead-time concept based on FLNG experience progressed, and it was selected as a project theme under a Ministry of Land, Infrastructure, Transport and Tourism program for fiscal 2019.
  7. FY2018RestatedAnnual report

    「In November 2017, the Company decided to participate in an ownership and chartering business for a floating production, storage and offloading facility for an oil and gas field off the coast of Ghana, with the aim of acquiring broad expertise and know-how in the offshore sector.」

    The decision to participate in the Ghana offshore floating facility ownership and chartering business, and the objective of acquiring offshore expertise and know-how, were also confirmed in the full-year report.
  8. FY2018-Q3First statedAnnual report

    「In addition, with the aim of acquiring broad expertise and know-how in the offshore field, the company decided in November of the same year to participate in the ownership and chartering business for a floating production, storage and offloading facility for an oil and gas field off the coast of Ghana.」

    It was first disclosed that, in November 2017, the Company decided to participate in an ownership and chartering business for a floating facility serving an oil and gas field off the coast of Ghana, with the aim of acquiring expertise and know-how in the offshore sector.
Moved together

"Outstanding guarantee obligations" moved the same way as this thread, in the same document, in 6 of its 10 moves.

654444★123456
  1. ★This thread
  2. 1Outstanding guarantee obligations6×
  3. 2Building environmental businesses through the establishment of the Sustainability Co-Creation Department5×
  4. 3Broad-based domestic and international EPC order-taking activities and award of a Philippine thermal power plant project4×
  5. 4Expansion of the domestic market share, applications and sales of the catalyst business4×
  6. 5Negative Cash Flow from Operating Activities4×
  7. 6Improving EPC business efficiency and transforming project management through AI and IoT4×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Jgc Holdings's next results are scheduled for 2026-11-11. Read the earnings preview It last moved in the Management Plan of 2026-05-14: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.