Jgc Holdings (1963) · InitiativeAdvancedLatest Share Issuance and Disposal (2026-08-06): "Achieved"

Entry into the EPC business for small modular reactors (SMRs)

First written in FY2022. 3 of 6 entries say "Advanced", first in FY2023. Latest entry: 2026-08-06.

6entries
5years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2022AdvancedFY2023ReframedFY20242022: 120222023: 120232024: 120242025: 020252026: 32026
Same theme, other companies
Nuclear Facility Decommissioning, Radioactive Waste Treatment and Next-Generation Reactor TechnologiesA theme 3 companies write about · 0 as a headwind · 5 as a tailwind

0 other companies' latest entry also says "Achieved".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「In the Romanian project, the operator decided to move to the next stage of development in anticipation of future EPC implementation. Consideration of a new construction project is progressing, and the Group is also conducting EPC preparation work for new projects.」

    For SMRs, efforts have progressed from the completed U.S. demonstration project to EPC preparations and the next stage for new-build projects, including the Romanian project.
  2. FY2024ReframedAnnual report

    「The project planned as the first US NuScale SMR demonstration plant ended without reaching construction, but consideration of a new construction project is under way, and our group is currently carrying out EPC preparation work for the new project.」

    The originally planned U.S. SMR demonstration plant project ended without reaching construction, and the plan was restructured toward EPC preparations for a new construction project.
  3. FY2023AdvancedAnnual report

    「The Carbon Free Power Project to build the first U.S. NuScale SMR demonstration plant at the site of Idaho National Laboratory is currently underway, with Fluor, NuScale and others preparing a combined construction and operating license application (COLA) and EPC-related preparations toward the planned start of operations in 2029. From fiscal 2022, the Group began assigning its engineers to Fluor's design and project management organizations.」

    Regarding entry into the SMR EPC business, the Group became involved in COLA and EPC preparation work for the U.S. demonstration plant's planned start of operations in 2029, and began assigning engineers from fiscal 2022.
  4. FY2022First statedAnnual report

    「With the aim of entering the EPC business for overseas SMR plants, the company invested in NuScale Power, LLC, a US company developing SMRs, in March 2021.」

    The Company first explicitly stated its initiative to enter the EPC business for overseas SMR plants through an investment in an SMR developer.
Moved together

"Steady execution of large-scale projects, centred on LNG" moved the same way as this thread, in the same document, in 3 of its 6 moves.

333322★123456
  1. ★This thread
  2. 1Steady execution of large-scale projects, centred on LNG3×
  3. 2Operating loss in the comprehensive engineering business3×
  4. 3Consolidated operating loss and net loss attributable to owners of parent3×
  5. 4Reliable profit generation in the EPC business3×
  6. 5Expansion of the domestic market share, applications and sales of the catalyst business2×
  7. 6Outstanding guarantee obligations2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Jgc Holdings's next results are scheduled for 2026-11-11. Read the earnings preview It last moved in the Share Issuance and Disposal of 2026-08-06: "Achieved".