Komori
EXEO Group (1951) · RiskRestated

Risk of Business Interruption Due to Natural Disasters and Pandemics

First written in FY2016. 15 of 25 entries say "Restated". Latest entry: FY2026-H1.

25entries
10years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2016 – FY2018-Q1RestatedFY2018 – FY2020-Q3RestatedFY2023-Q3 – FY2026-H12016: 320162017: 320172018: 320182019: 120192020: 420202021: 320212022: 320222023: 220232024: 220242025: 12025
Same theme, other companies
Emergency Response Framework Based on a Business Continuity Plan (BCP)A theme 314 companies write about · 75 as a headwind · 243 as a tailwind

The whole theme swung hardest in 2020: 22 of 113 companies on the "Worse" side.

98 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 195 companies compared. The sentences above are computed from all 195.Comparing 200 of the theme's 319 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2026-H1RestatedAnnual report

    「During the interim consolidated accounting period, there were no material changes or new developments from the descriptions in the securities report for the previous fiscal year.」

    The company stated that there have been no material changes or new developments regarding the risk of business interruption caused by natural disasters or pandemics.
  2. FY2025-H1RestatedAnnual report

    「During the interim consolidated accounting period, there were no material changes or new developments from the descriptions in the securities report for the previous fiscal year.」

    The company stated that there have been no material changes or new developments regarding the risk of business interruption caused by natural disasters or pandemics.
  3. FY2024RestatedAnnual report

    「If an unforeseen event occurs, such as a large-scale disaster or a pandemic of an infectious disease, typified by the global spread of COVID-19, or the resulting suspension of lifelines, shortages of fuel, materials, or personnel causing construction stoppages or delays, or damage to the buildings, equipment, or materials at business sites, the event may affect the Group's performance and business continuity plan (BCP).」

    The company continues to identify as major risks the possibility that natural disasters or pandemics could cause construction stoppages or delays, asset damage, and impacts on its BCP.
  4. FY2024-Q1RestatedAnnual report

    「The Group continued to operate its business efficiently while making maximum use of its internal telework environment and continuing efforts to prevent COVID-19 infections.」

    The company continues to operate its business while preventing COVID-19 infections and making use of its telework environment.
  5. FY2023-Q3RestatedAnnual report

    「Amid this business environment, the Group continued to operate its business cautiously and flexibly, making maximum use of its internal telework environment while continuing efforts to prevent COVID-19 infections.」

    The company continues to operate its business cautiously and flexibly by preventing COVID-19 infections and making use of its telework environment.
  6. FY2023-Q1WorsenedAnnual report

    「During the first quarter of the current fiscal year on a cumulative consolidated basis (1 April 2022 to 30 June 2022), the Japanese economy was gradually recovering as the impact of COVID-19 weakened. However, infections have recently been spreading again both in Japan and overseas, and continued caution is required.」

    The company stated that, while the weakening impact of COVID-19 indicated a trend toward economic recovery, infections were spreading again in Japan and overseas, creating a situation requiring continued caution.
  7. FY2022MitigatedAnnual report

    「The company has operated its business cautiously and flexibly by thoroughly sterilising and disinfecting offices, providing voluntary PCR test kits, thoroughly communicating rules of conduct to employees, implementing staggered working hours and telework, restricting the holding of and participation in group meetings and events, restricting domestic and overseas business travel, and being among the first to conduct workplace vaccinations, with plans to administer a total of 3 vaccine doses.」

    As part of its response to COVID-19, the company systematically described measures including administering a total of 3 workplace vaccine doses, disinfection, PCR testing, telework, and travel restrictions.
  8. FY2022-Q3MitigatedAnnual report

    「The Group has operated its business cautiously and flexibly, including by being among the first to conduct workplace COVID-19 vaccinations and by preparing for the third vaccine dose」

    The company stated that it had conducted workplace vaccinations and was also preparing for the third dose as a response to the business continuity risk posed by COVID-19.
  9. FY2022-Q2MitigatedAnnual report

    「Amid this business environment, the Group has operated its business cautiously and flexibly, including by being among the first to conduct workplace COVID-19 vaccinations」

    The company stated that it had conducted workplace vaccinations as a response to the business continuity risk posed by COVID-19.
  10. FY2022-Q1MitigatedAnnual report

    「Amid this business environment, the Group has operated its business cautiously and flexibly, including by being among the first to begin workplace COVID-19 vaccinations」

    As a response to the business continuity risk posed by COVID-19, the company stated that it had begun workplace vaccinations and was operating its business cautiously and flexibly.
  11. FY2021MaterialisedAnnual report

    「The global spread of COVID-19, which became apparent from late January 2020, forced the Group's global business to suspend its activities, particularly because of lockdowns in Southeast Asian countries. However, its impact on the Group's overall performance has remained limited.」

    Regarding the previously anticipated pandemic risk, the company stated that lockdowns in Southeast Asian countries had actually caused the global business to stagnate. Meanwhile, it described the impact on the Group's overall performance as limited.
  12. FY2021-Q2MaterialisedAnnual report

    「Amid this business environment, the Group has continued to operate its business cautiously and flexibly, although the impact of COVID-19 has caused some supply chain disruptions in mobile-sector construction, and the impact remains limited」

    The company stated that supply chain disruptions associated with COVID-19 had actually occurred in mobile-sector construction. However, it described the impact as limited.
  13. FY2021-Q1RestatedAnnual report

    「Based on information currently available, the company has made significant accounting estimates on the assumption that the impact of the COVID-19 pandemic will be limited. Depending on the spread of COVID-19 and its impact on the economy, the pandemic may affect the Group's financial position and operating results from the second quarter of the fiscal year onward.」

    The company continues to state that, while assuming the impact of COVID-19 is currently limited, future operating results could be affected by changes in the spread of the infection and its economic impact.
  14. FY2020MaterialisedAnnual report

    「If an unforeseen event occurs, such as a large-scale disaster or the resulting suspension of lifelines, shortages of fuel, materials, or personnel causing construction stoppages or delays, or damage to the buildings, equipment, or materials at business sites, the event may affect the performance of the Group. The impact of the COVID-19 pandemic is currently limited, but it could become greater than currently anticipated as circumstances and other conditions change.」

    The company stated that the previously anticipated pandemic risk had materialised with the COVID-19 pandemic. While describing the impact as currently limited, it indicated the possibility of spillover effects, including construction stoppages and delays.
  15. FY2020-Q3RestatedAnnual report

    「No material changes or new developments have occurred compared with the description in the Securities Report filed on 21 June 2019.」

    The company stated that there have been no material changes or new developments regarding the risk of business interruption caused by natural disasters or pandemics.
  16. FY2019-Q3RestatedAnnual report

    「No material changes or new developments have occurred compared with the description in the Securities Report filed on 22 June 2018.」

    The company stated that there have been no material changes or new developments regarding the risk of business interruption caused by natural disasters or pandemics.
  17. FY2019-Q2RestatedAnnual report

    「No material changes or new developments have occurred compared with the description in the Securities Report filed on 22 June 2018.」

    The company stated that there have been no material changes or new developments regarding the risk of business interruption caused by natural disasters or pandemics.
  18. FY2019-Q1RestatedAnnual report

    「No material changes or new developments have occurred compared with the description in the Securities Report filed on 22 June 2018.」

    The company stated that there have been no material changes or new developments regarding the risk of business interruption caused by natural disasters or pandemics.
  19. FY2018RestatedAnnual report

    「However, if an unforeseen event were to occur, such as a major disaster and the resulting interruption of lifelines, shortages of fuel, materials and personnel, interruption or delays in construction, or damage to office buildings, equipment and materials, this could affect our Group's performance.」

    While describing responses involving facilities, training, and rules and manuals, the company continues to identify the risks of construction stoppages or delays and asset damage resulting from large-scale disasters.
  20. FY2018-Q2MitigatedAnnual report

    「To improve productivity, we consolidated the technical centers in southwestern Kanagawa Prefecture and constructed the Shonan General Technical Center in Fujisawa, Kanagawa Prefecture. The center will also serve as a base for the business continuity plan (BCP) in the event of a large-scale disaster in the Tokyo metropolitan area.」

    The company stated that the newly established Shonan Comprehensive Technical Center will serve as a BCP base in the event of a major disaster in the Tokyo metropolitan area.
  21. FY2018-Q1RestatedAnnual report

    「No material changes or new developments have occurred compared with the description in the Securities Report filed on 23 June 2017.」

    The company stated that there have been no material changes or new developments regarding the risk of business interruption caused by natural disasters or pandemics.
  22. FY2017-Q3RestatedAnnual report

    「No material changes or new developments have occurred compared with the description in the Securities Report filed on 24 June 2016.」

    The company stated that there have been no material changes or new developments regarding the risk of business interruption caused by natural disasters or pandemics.
  23. FY2017-Q2RestatedAnnual report

    「No material changes or new developments have occurred compared with the description in the Securities Report filed on 24 June 2016.」

    The company stated that there have been no material changes or new developments regarding the risk of business interruption caused by natural disasters or pandemics.
  24. FY2017-Q1RestatedAnnual report

    「No material changes or new developments have occurred compared with the description in the Securities Report filed on 24 June 2016.」

    The company stated that there have been no material changes or new developments regarding the risk of business interruption caused by natural disasters or pandemics.
  25. FY2016First statedAnnual report

    「In preparation for natural disasters and novel-virus pandemics, we prioritize avoiding harm to people while maintaining business continuity, and work to avoid and minimize risks through the installation of various facilities, the implementation of drills, and the preparation of rules and manuals.」

    Business continuity measures for natural disasters and novel-virus pandemics include facilities, drills, rules, and manuals.
Moved together

"Developing the System Solutions Business into a Second Core Business" moved the same way as this thread, in the same document, in 5 of its 25 moves.

554443★123456
  1. ★This thread
  2. 1Developing the System Solutions Business into a Second Core Business5×
  3. 2Political, Economic, Foreign Exchange and Regulatory Risks Associated with Overseas Business Expansion5×
  4. 3Total Solutions Harnessing the Group’s Full Strength and a New Growth Stage4×
  5. 4Expanding the Urban Infrastructure Business as a Growth Engine4×
  6. 5Expanding ICT Solutions, Maintenance, Cloud and Geospatial Businesses4×
  7. 6Improving Productivity and Quality and Enhancing Efficiency in the Telecommunications Infrastructure Construction Business3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
EXEO Group's next results are scheduled for 2026-11-06. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.