Komori
Kandenko (1942) · InitiativeRestated

Initiatives in the Renewable Energy Generation Business

First written in FY2016. 6 of 9 entries say "Advanced", first in FY2017. Latest entry: FY2026.

9entries
11years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2017 – FY2018AdvancedFY2021 – FY20242016: 120162017: 120172018: 120182019: 020192020: 120202021: 120212022: 120222023: 120232024: 120242025: 020252026: 12026
Same theme, other companies
Expanding the Solar, Wind and Biomass Power PortfolioA theme 33 companies write about · 0 as a headwind · 40 as a tailwind

The whole theme swung hardest in 2025: 2 of 20 companies on the "Worse" side.

4 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 33 companies compared. The sentences above are computed from all 33.
Full recordFilings, disclosures and news, newest first
  1. FY2026RestatedAnnual report

    「Implementation of self-wheeling using the Company’s solar power generation facilities」

    The Company has identified self-wheeling using renewable energy power generation facilities as one measure to reduce environmental impact.
  2. FY2024AdvancedAnnual report

    「Ioka Wind Power Plant Machinery and equipment, etc. 3,403 2,727 Internal funds Scheduled completion: November 2024 Planned power generation: 18,849 MWh/year」

    For the Ioka Wind Power Plant, ¥2,727 million of the planned investment of ¥3,403 million has already been paid. The project is proceeding with scheduled completion in November 2024 and planned power generation of 18,849 MWh/year.
  3. FY2023AdvancedAnnual report

    「During the consolidated fiscal year, the Company invested mainly in the acquisition of renewable energy power generation facilities. The total investment, before elimination of intersegment internal transactions, was ¥1,103 million. Ioka Wind Power Plant Machinery and equipment, etc. 3,403 365 Internal funds Scheduled completion: November 2024 Planned power generation: 18,849 MWh/year」

    The Company disclosed current-year investment of ¥1,103 million in renewable energy power generation facilities and changed the planned investment for the Ioka Wind Power Plant from ¥3,347 million to ¥3,403 million.
  4. FY2022AdvancedAnnual report

    「KANDENKO CO., LTD. Ioka Wind Power Plant Machinery and equipment, etc. 3,347 21 Internal funds Scheduled completion: November 2024 Planned power generation: 18,849 MWh/year」

    The Company disclosed a specific plan for the Ioka Wind Power Plant, with planned investment of ¥3,347 million, scheduled completion in November 2024, and planned power generation of 18,849 MWh/year.
  5. FY2021AdvancedAnnual report

    「During the consolidated fiscal year, the Company invested mainly in the acquisition of renewable energy power generation facilities. The total investment, before elimination of intersegment internal transactions, was ¥2,026 million.」

    The Company made ¥2,026 million in investment, mainly for the acquisition of renewable energy power generation facilities.
  6. FY2020RestatedAnnual report

    「Furthermore, the Company is promoting business expansion into network-related social infrastructure fields such as railways and water supply, as well as renewable energy power generation.」

    The Company continues to promote the renewable energy power generation business as part of its expansion into new business areas.
  7. FY2018AdvancedAnnual report

    「During the consolidated fiscal year, the Company invested mainly in the acquisition of renewable energy power generation facilities. The total investment, before elimination of intersegment internal transactions, was ¥7,575 million.」

    The Company disclosed current-year investment of ¥7,575 million in renewable energy power generation facilities, and that the Maebashi Biomass Power Plant began commercial operation in March 2018.
  8. FY2017AdvancedAnnual report

    「(Other businesses) During the consolidated fiscal year, the Company invested mainly in the acquisition of renewable energy power generation facilities. The total investment, before elimination of intersegment internal transactions, was ¥5,337 million.」

    The Company disclosed that it made ¥5,337 million in capital investment during the fiscal year in the renewable energy power generation business.
  9. FY2016First statedAnnual report

    「The Company will also pursue renewable energy power generation by leveraging the technologies and expertise accumulated through the design and construction of solar and wind power generation systems.」

    The policy is to extend the Company’s solar and wind power design and construction track record into the power generation business. An investment plan for power generation facilities is also described.
Moved together

"Technology Development to Address Customer Needs, Improve Safety, Reduce Labor Requirements, and Expand Business Areas" moved the same way as this thread, in the same document, in 6 of its 9 moves.

665544★123456
  1. ★This thread
  2. 1Technology Development to Address Customer Needs, Improve Safety, Reduce Labor Requirements, and Expand Business Areas6×
  3. 2Capital investment for business continuity, disaster prevention, increased construction capacity, and power generation operations6×
  4. 3Technology and IT Development to Improve Construction Efficiency and Reduce Labor5×
  5. 4Improving Safety at Construction Sites5×
  6. 5Increase in Next Annual Dividend to ¥164×
  7. 6Death of an Officer and Changes in Areas of Oversight4×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Kandenko's next results are scheduled for 2026-10-30. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.