Komori
Hokuriku Electrical Construction (1930) · InitiativeAdvanced

Research on monitoring transmission-line sag using high-precision GPS

First written in FY2021. 3 of 4 entries say "Advanced", first in FY2023. Latest entry: FY2026.

4entries
6years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2021AdvancedFY2023 – FY20262021: 120212022: 020222023: 120232024: 020242025: 120252026: 12026
Same theme, other companies
High-Precision GPS Technology for Monitoring Transmission-Line SagA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「A sag measurement device using high-precision GPS was developed. The technology is currently being introduced to electrical contractors nationwide, demonstration tests are being conducted at various sites, and improvements are being made toward commercialization.」

    High-precision GPS-based sag measurement has reached the equipment development stage and is progressing through introductions to electrical contractors nationwide, on-site demonstrations and improvements toward commercialization.
  2. FY2025AdvancedAnnual report

    「A sag measurement system using high-precision GPS was developed. This makes it possible to check sag data from the ground using a smartphone, eliminating the need to climb transmission towers and improving work safety and efficiency.」

    For transmission-line sag measurement using high-precision GPS, the disclosure describes the development of the measurement system and its safety and efficiency benefits, moving beyond the research stage.
  3. FY2023AdvancedAnnual report

    「The Group is developing and testing a monitoring system capable of measuring sag in real time by mounting high-performance GPS on a drone and remotely controlling it to trace transmission lines.」

    The previous GPS unit research is being developed into the development and demonstration of a real-time observation system using drones equipped with high-performance GPS.
  4. FY2021First statedAnnual report

    「A GPS unit that measures positional information is attached to the power line to measure sag. The positional information transmitted by the GPS unit is converted into a sag value in a smartphone application, and the measured value is displayed in real time to determine the sag.」

    This research aims to shorten construction time and reduce the number of personnel required for inspections by replacing visual observation from transmission towers, which is difficult in bad weather or when obstacles are present, with GPS units attached to power lines and a smartphone app.
Moved together

"A Profit Generation Structure Through Higher On-Site Productivity and Cost Reduction" moved the same way as this thread, in the same document, in 2 of its 4 moves.

222222★123456
  1. ★This thread
  2. 1A Profit Generation Structure Through Higher On-Site Productivity and Cost Reduction2×
  3. 2Development of a management framework for increasingly diverse and complex risks2×
  4. 3Loss of momentum in private and public capital investment2×
  5. 4Climate-Related Disclosure Based on the TCFD Recommendations2×
  6. 5Introduction of a Stock Compensation Trust (BBT)2×
  7. 6No material matters concerning research and development activities2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Hokuriku Electrical Construction yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.