Estimation uncertainty related to construction revenue under the percentage-of-completion method

First written in FY2021. 3 of 5 entries say "Reframed", first in FY2022. Latest entry: FY2026.

5entries
6years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2021ReframedFY2022 – FY2023AdvancedFY20252021: 120212022: 120222023: 120232024: 020242025: 120252026: 12026
Same theme, other companies
Uncertainty in Cost and Progress Estimates for Construction Revenue RecognitionA theme 105 companies write about · 104 as a headwind · 2 as a tailwind

Tomoe moved to the "Worse" side of this theme in 2022, 3 years before the typical company in this theme (2025).

The whole theme swung hardest in 2024: 11 of 69 companies on the "Worse" side.

3 other companies' latest entry also says "Reframed".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 105 companies compared. The sentences above are computed from all 105.
Full recordFilings, disclosures and news, newest first
  1. FY2026ReframedAnnual report

    「Revenue from completed construction under contracts for which performance obligations are satisfied over time (Percentage of revenue from completed construction) ¥24,578,522 thousand (88.0%)」

    Revenue from completed construction under contracts for which performance obligations are satisfied over time decreased from ¥26,272,942 thousand in the previous fiscal year, while its percentage of revenue from completed construction increased from 83.7% to 88.0%.
  2. FY2025AdvancedAnnual report

    「Revenue from completed construction under contracts for which performance obligations are satisfied over time ¥26,272,942 thousand (83.7% of revenue from completed construction)」

    Revenue from completed construction under contracts for which performance obligations are satisfied over time increased from ¥25,415,766 thousand, or 81.8%, in the previous fiscal year to ¥26,272,942 thousand, or 83.7%.
  3. FY2023ReframedAnnual report

    「Revenue from completed construction under contracts for which performance obligations are satisfied over time (excluding completed projects) ¥10,981,283 thousand (32.4% of revenue from completed construction) Revenue from completed construction under contracts for which performance obligations are satisfied over time ¥30,208,690 thousand (89.2% of revenue from completed construction)」

    Under the revenue recognition accounting standard, revenue from completed construction was ¥10,981,283 thousand, or 32.4%, for incomplete projects and ¥30,208,690 thousand, or 89.2%, for all applicable completed construction revenue.
  4. FY2022ReframedAnnual report

    「Revenue from completed construction projects under contracts for which performance obligations are satisfied over time (excluding completed construction projects): ¥10,765,665 thousand (46.3% of revenue from completed construction projects)」

    The contracts were reclassified from those accounted for under the former percentage-of-completion method as contracts for which performance obligations are satisfied over time under the revenue recognition standard. Revenue from the applicable completed construction projects was ¥10,765,665 thousand, representing 46.3% of revenue from completed construction projects.
  5. FY2021First statedAnnual report

    「In applying the percentage-of-completion method, the total contract revenue, total contract costs and percentage of completion at the end of the current consolidated fiscal year are reasonably estimated. If total contract revenue is revised due to specification changes or other matters agreed with the customer, or if total contract costs need to be revised due to changes in estimates of the work required and labor hours through completion, this may affect the performance of the Group.」

    For ¥2,676,964 thousand in revenue from completed construction projects recognized under the percentage-of-completion method, changes in estimates of the construction period, material and subcontracting costs, labor costs and other items are disclosed independently for the first time as a material accounting estimate that may affect performance.
Moved together

"Uncertainty over the outlook due to yen appreciation, falling stock prices and a slowdown in emerging-market economies" moved the same way as this thread, in the same document, in 3 of its 5 moves.

333333★123456
  1. ★This thread
  2. 1Uncertainty over the outlook due to yen appreciation, falling stock prices and a slowdown in emerging-market economies3×
  3. 2Decrease in cash and cash equivalents compared with the end of the same period of the previous year and the end of the previous fiscal year3×
  4. 3Increase in Short-Term Borrowings and Decrease in Long-Term Borrowings3×
  5. 4Year-on-year decrease in cash flow from operating activities3×
  6. 5Maintaining Positive Free Cash Flow3×
  7. 6Increase in Total Assets Due to Increases in Costs on Uncompleted Construction Contracts, Cash and Deposits3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Tomoe's next results are scheduled for 2026-11-13. Read the earnings preview