Japan Foundation Engineering (1914) · RiskCited as achieved
Heavy rain and flooding damage at construction sites
First written in FY2016. 1 of 2 entries say "Cited as achieved", first in FY2017. Latest entry: FY2017.
2entries
2years
0from disclosures
How it moved
Same theme, other companies
Flooding Losses at Construction Sites Caused by Heavy RainfallA theme 1 companies write about · 1 as a headwind · 0 as a tailwind
No other company in this theme has enough history to compare yet.
Full recordFilings, disclosures and news, newest first
- FY2017Cited as achievedAnnual report
「In the previous consolidated fiscal year, the cost of damage from equipment and materials at the company's contracted construction sites being submerged due to torrential rain associated with Typhoons 17 and 18, amounting to ¥28.131 million, was recorded as an extraordinary loss.」
The damage from torrential rain and flooding did not occur in the current period and is being reproduced as comparative information for the previous consolidated fiscal year. - FY2016First statedAnnual report
「The cost of damage from equipment and materials at the company's contracted construction sites being submerged due to torrential rain associated with Typhoons 17 and 18, amounting to ¥28.131 million, was recorded as an extraordinary loss.」
Damage from equipment and materials at the construction site being submerged due to torrential rain associated with a typhoon actually occurred, and ¥28.131 million was recorded as an extraordinary loss.