Fukuda (1899) · InitiativeAdvanced
Energy management system for tunnel worksites
First written in FY2023. 1 of 2 entries say "Achieved", first in FY2023. Latest entry: FY2024.
2entries
2years
0from disclosures
How it moved
Same theme, other companies
Energy management system for tunnel worksitesA theme 1 companies write about · 0 as a headwind · 1 as a tailwind
No other company in this theme has enough history to compare yet.
Full recordFilings, disclosures and news, newest first
- FY2024AdvancedAnnual report
「当期は、トンネル現場における電力消費量の見える化と主要設備の最適運転により電力消費量を削減する「エネルギーマネジメントシステム」の実用検証と、「山岳トンネル用出来形見える化技術の開発」に関する方法比較検証を実現場で行い、成果を得ました。」
エネルギーマネジメントシステムと出来形見える化技術について、実現場での実用検証・比較検証を行い、成果を取得した。 - FY2023AchievedAnnual report
「The company developed an energy management system that visualizes electricity consumption at tunnel worksites and reduces consumption through optimal operation of major equipment, and began full-scale operation at actual worksites.」
The company developed a system to visualize electricity consumption and optimize the operation of major equipment at tunnel worksites, then began full-scale operation. It also cited contributions to carbon neutrality and the SDGs.