Penta-Ocean Construction (1893) · InitiativeAchieved

Plan to Build a New SEP-Type Multipurpose Crane Vessel

First written in FY2017-Q2. 1 of 5 entries say "Restated". Latest entry: FY2019.

5entries
4years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2017-Q2 – FY2017SoftenedFY20182016: 120162017: 220172018: 120182019: 12019
Same theme, other companies
Entry into Construction of Wind-Power-Related FacilitiesA theme 5 companies write about · 0 as a headwind · 8 as a tailwind

0 other companies' latest entry also says "Achieved".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2019AchievedAnnual report

    「The Company developed and built the SEP-type multipurpose crane vessel CP-8001. It was completed in December 2018, and familiarization training was also conducted.」

    For the SEP-type multipurpose crane vessel, CP-8001 was completed in December 2018, ahead of the previous scheduled completion date, and familiarization training was also conducted.
  2. FY2018SoftenedAnnual report

    「SEP-type multipurpose crane vessel (1 vessel) ¥12,000 million ¥7,922 million Internal funds Scheduled for completion in November 2018」

    The total planned investment of ¥12,000 million, amount already paid of ¥7,922 million and financing from internal funds for the SEP-type multipurpose crane vessel remain in place, but the scheduled completion has been postponed from September 2018 to November 2018.
  3. FY2017RestatedAnnual report

    「By adding SEP functionality to this 800-ton full-rotation crane vessel, the vessel will enable safe crane operations and construction work with high operating rates and construction accuracy, even in areas with severe weather and sea conditions. After completion, scheduled for September 2018, the Company plans to deploy it actively on a wide variety of projects in conjunction with its self-propelled multipurpose crane vessel CP-5001 and other vessels.」

    The scheduled September 2018 completion of the SEP-type multipurpose crane vessel, its 800-ton lifting capacity and the policy of deploying it on projects after completion have been reconfirmed, but no completion results have yet been reported.
  4. FY2017-Q3Updated the amount already paid from ¥2,542 million to ¥2,544 millionAnnual report

    「SEP-type multipurpose crane vessel (1 vessel) ¥12,000 million ¥2,544 million Internal funds Scheduled for completion in September 2018」

    The planned total investment, financing method and scheduled September 2018 completion date for 1 SEP-type multipurpose crane vessel remain unchanged; only the amount already paid has been updated to ¥2,544 million.
  5. FY2017-Q2First statedAnnual report

    「SEP-type multipurpose crane vessel (1 vessel) ¥12,000 million ¥2,542 million Internal funds Scheduled for completion in September 2018」

    The newly finalized plan for a major new facility calls for a total investment of ¥12,000 million in 1 SEP-type multipurpose crane vessel, with ¥2,542 million already paid, financing from internal funds and completion scheduled for September 2018.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
No upcoming earnings preview for Penta-Ocean Construction yet.