Komori
Daito Trust Construction (1878) · InitiativeAdvanced

Retrofitting the Head Office into an Existing-Building ZEB

First written in FY2024. 2 of 3 entries say "Advanced", first in FY2025. Latest entry: FY2026.

3entries
3years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2024AdvancedFY2025 – FY20262024: 120242025: 120252026: 12026
Same theme, other companies
Retrofitting the Head Office into an Existing-Building ZEBA theme 2 companies write about · 0 as a headwind · 2 as a tailwind

0 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「改修工事は2025年4月から開始し、当社グループが使用しているフロアから、順次全フロアに拡大し、現時点での工事完了については2028年度末を予定しています。」

    品川本社ビルのZEB化改修を2025年4月から開始し、使用フロアから全フロアへ順次拡大する計画とし、2028年度末の完了予定を示している。
  2. FY2025AdvancedAnnual report

    「改修工事は2025年度より、当社グループ使用フロアから開始し、順次全フロアに拡大いたします。」

    品川本社ビルのZEB認証取得後、2025年度からグループ使用フロアの改修を開始し、順次全フロアへ拡大する段階へ進めている。
  3. FY2024First statedAnnual report

    「また、2020年より、弊社品川本社ビルを使いながらZEB(ゼブ:ネット・ゼロ・エネルギー・ビル)化に向けた改修工事を試験的にすすめ、2023年3月、建築物省エネルギー性能表示制度(BELS)のZEB認証を取得しました。今回のZEB化改修計画により同ビルは、事務所用途部分で基準一次エネルギー消費量から40%以上、建物全体では20%以上削減することができます。」

    品川本社ビルのZEB化改修を進め、2023年3月にZEB認証を取得した。事務所用途部分で40%以上、建物全体で20%以上の一次エネルギー消費量削減を見込んでいる。
Moved together

"Meeting Tenant Needs by Expanding the Product Lineup" moved the same way as this thread, in the same document, in 2 of its 3 moves.

222222★123456
  1. ★This thread
  2. 1Meeting Tenant Needs by Expanding the Product Lineup2×
  3. 2Expansion into Commercial, Logistics, Hotel, Dormitory and Flexible-Office Properties2×
  4. 3A Stock-Based Business Leveraging More Than 1.2 Million Managed Units2×
  5. 4Absorption Mergers of Consolidated Subsidiaries and Unification of Fiscal Year-Ends2×
  6. 5Oversight and Evaluation by Outside Directors and the Governance Committee2×
  7. 6Development of New Construction Methods, Soundproofing, Security and Passive Design2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Daito Trust Construction's next results are scheduled for 2026-10-30. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.