Komori
PS Construction (1871) · InitiativeFirst statedLatest Earnings presentation (2026-06-02): "Advanced"

Seismic Retrofitting Anchor Method for Voided Slab Bridges

First written in FY2024. 1 of 2 entries say "Advanced", first in 2026-06-02. Latest entry: 2026-06-02.

2entries
3years
1from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY20242024: 120242025: 020252026: 12026
Same theme, other companies
Seismic isolation and vibration control, seismic reinforcement, and bridge aging measuresA theme 4 companies write about · 0 as a headwind · 4 as a tailwind

3 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Seismic Retrofitting Anchor Method for Voided Slab Bridges | PS Construction Co.,Ltd. (1871) | Komori