PS Construction (1871) · InitiativeRaisedLatest Financial results presentation (2026-06-03): "Advanced"
Strengthening Architectural Design and Proposal Capabilities Through BIM Adoption
First written in FY2018. 2 of 4 entries say "Advanced", first in 2026-06-02. Latest entry: 2026-06-03.
4entries
9years
2from disclosures
How it moved
Same theme, other companies
Proposals for New Facility Construction and Renovations Leveraging Design and Technical CapabilitiesA theme 4 companies write about · 0 as a headwind · 4 as a tailwind
1 other company's latest entry also says "Advanced".
Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
- FY2020RaisedAnnual report
「The design division will strengthen its proposal and cost competitiveness by maximizing the use of BIM (Building Information Modeling).」
For BIM, the company expanded its intended scope of use from preparations for adoption to maximizing its use to strengthen proposal and cost competitiveness. - FY2018First statedAnnual report
「For the fiscal year ended March 2018, we strengthened the organization of the PC division, further developed sales tools such as PR videos, and began preparations to introduce BIM in order to strengthen our design and proposal capabilities.」
To strengthen the building business's design and proposal capabilities, the company strengthened the organization of the PC division, developed sales tools such as PR videos, and began preparations to introduce BIM.