Inspection and diagnostic data platform for existing prestressed concrete bridges under the Hashimori Project (Bridge Stewardship Project)
First written in FY2017. 1 of 2 entries say "Advanced", first in FY2018. Latest entry: FY2018.
No other company in this theme has enough history to compare yet.
- FY2018AdvancedAnnual report
「The number of bridges surveyed under this project has reached 430 across 23 prefectures (as of March 2018). Including bridges inspected before then, we hold inspection data for approximately 3,700 bridges.」
Reports that the Bridge Guardian Project's survey results have increased to 430 bridges and that approximately 3,700 bridges' worth of inspection data is held. The company plans to assign inspection personnel to each branch and further enhance the data. - FY2017First statedAnnual report
「The “Hashimori Project” is an initiative under which the company's technical staff consistently conduct inspections and diagnoses of existing PC bridges constructed by the company. It was fully launched in 2011. The number of bridges surveyed under the project reached 410 as of October 2016. Including bridges inspected before the project, the company holds inspection data for approximately 5,400 bridges. It has also integrated all of this inspection data into a database within its mapping system and modified the system so that construction materials, as-built drawings and other documents can be searched.」
The company conducts consistent inspections and diagnoses of existing PC bridges, has surveyed 410 bridges and holds data for approximately 5,400 bridges, which it integrated into the database of its mapping system.