PS Construction (1871) · InitiativeAdvanced
Completion of an Elevation Control System for Bridge Superstructures
First written in FY2021. 1 of 2 entries say "Advanced", first in FY2022. Latest entry: FY2022.
2entries
2years
0from disclosures
How it moved
Same theme, other companies
Camber management system for bridge superstructuresA theme 1 companies write about · 0 as a headwind · 1 as a tailwind
No other company in this theme has enough history to compare yet.
Full recordFilings, disclosures and news, newest first
- FY2022AdvancedAnnual report
「In fiscal 2021, the company significantly upgraded the system developed in previous fiscal years, enabling advanced management functions such as simultaneous management of multiple piers and simulation of the final configuration after bridge completion.」
The completed overcamber management system underwent a major upgrade, including simultaneous management of multiple piers and final-configuration simulation. - FY2021First statedAnnual report
「As part of the group's ICT initiatives, the company completed development of an overcamber management system for cantilever construction of bridge superstructures.」
For elevation management during cantilever bridge construction, the company completed a system incorporating deformation calculations and field surveying, presenting a specific new measure to reduce workload and improve management and as-built accuracy.