PS Construction (1871) · InitiativeAdvanced
Development of a Flat PC Beam Construction Method
First written in FY2022. 1 of 2 entries say "Advanced", first in FY2023. Latest entry: FY2023.
2entries
2years
0from disclosures
How it moved
Same theme, other companies
Development and Expanded Application of the Okumura-Style Flat-Beam Construction MethodA theme 2 companies write about · 0 as a headwind · 2 as a tailwind
0 other companies' latest entry also says "Advanced".
Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
- FY2023AdvancedAnnual report
「The method obtained a building technology performance certificate from the General Building Research Corporation of Japan in fiscal 2022, and the company is marketing it for adoption.」
Development of the shallow precast concrete beam construction method progressed from the stages of structural testing and design-method examination to obtaining performance certification from a third-party organization and commercial deployment. - FY2022First statedAnnual report
「The Company is developing a “shallow precast concrete beam construction method” that increases beam width while reducing beam depth compared with conventional beams. Structural testing was conducted in fiscal 2020 and fiscal 2021, and structural performance and design methods are being examined.」
The Company is developing a shallow precast concrete beam construction method to enable open large-span spaces and greater flexibility in planning building services piping, and conducted structural testing and examined design methods in fiscal 2020 and fiscal 2021.