Liability for Defects, Product Liability, Antitrust Law Violations, and Other Matters

First written in FY2016. 3 of 7 entries say "Restated". Latest entry: FY2023.

7entries
8years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2016 – FY2017MaterialisedFY2018ReframedFY20202016: 320162017: 120172018: 120182019: 020192020: 120202021: 020212022: 020222023: 12023
Same theme, other companies
Complex Litigation Risk Relating to Pharmaceuticals, Product Liability, Labor, and Fair TradeA theme 6 companies write about · 6 as a headwind · 0 as a tailwind

PS Construction moved to the "Worse" side of this theme in 2018.

3 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2023RestatedAnnual report

    「Although the company takes every possible precaution in quality control, if substantial damages arise from contractual nonconformity liability or product liability, they may affect the group's performance.」

    The company continues to disclose the risk of damages arising from quality deficiencies and product liability, including the change in legal terminology from liability for defects to contractual nonconformity liability.
  2. FY2020ReframedAnnual report

    「Although the company takes every possible precaution in quality control, if substantial damages arise from contractual nonconformity liability or product liability, they may affect the group's performance.」

    The legal terminology changed from the previous term "liability for defects" to "contractual nonconformity liability," but the company continues to disclose the risk of damages arising from quality deficiencies and product liability.
  3. FY2018MaterialisedAnnual report

    「Profit came in ¥230 million above target, but the company was unable to build up profit in the fourth quarter of the fiscal year ending March 2018 due to certain defective construction projects.」

    The company states that certain defective construction projects actually occurred in its construction business, affecting profit accumulation in the fourth quarter of the fiscal year.
  4. FY2017RestatedAnnual report

    「Although the company takes every possible precaution in quality control, if substantial damages arise from liability for defects or product liability, they may affect business performance. In particular, order opportunities may decline due to debarment or similar measures resulting from violations of the Antimonopoly Act.」

    The company continues to disclose the risks of liability for defects and product liability, as well as debarment and fewer order opportunities associated with violations of the Antimonopoly Act.
  5. FY2017-Q2RestatedAnnual report

    「With respect to the "FY2012 San'en-Nanshin Route 19 Bridge PC Superstructure Construction Project," ordered by the Chubu Regional Development Bureau of the Ministry of Land, Infrastructure, Transport and Tourism (the project owner) on 21 January 2013 and constructed by the company, if the project owner determines that the project must be removed and reconstructed, the company bears liability for defects, capped at ¥1.669 billion, for a period of 10 years from the start of service.」

    The company continues to disclose liability for defects relating to a particular construction project, capped at ¥1.669 billion for a 10-year period, with no material change in the disclosure.
  6. FY2017-Q1Specific Measures DefinedAnnual report

    「With respect to the "FY2012 San'en-Nanshin Route 19 Bridge PC Superstructure Construction Project" constructed by the company, if the project owner determines that the project must be removed and reconstructed, the company bears liability for defects, capped at ¥1.669 billion, for a period of 10 years from the start of service.」

    The risk relating to liability for defects has been specified as a contingent liability involving a particular construction project, a 10-year period and a ¥1.669 billion cap. The disclosure does not state that removal and reconstruction has been determined to be necessary.
  7. FY2016First statedAnnual report

    「If substantial damages arise from liability for defects or product liability, they may affect business performance. In particular, order opportunities may decline due to debarment or similar measures resulting from violations of the Antimonopoly Act.」

    The company identifies quality incidents and product liability, as well as debarment and fewer order opportunities due to violations of the Antimonopoly Act, as risks.
Moved together

"Deterioration in the Order and Earnings Environment Due to Renewed Competition for Orders" moved the same way as this thread, in the same document, in 2 of its 7 moves.

2★1
  1. ★This thread
  2. 1Deterioration in the Order and Earnings Environment Due to Renewed Competition for Orders2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for PS Construction yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Liability for Defects, Product Liability, Antitrust Law Violations, and Other Matters | PS Construction Co.,Ltd. (1871) | Komori