Komori
PS Construction (1871) · InitiativeAdvanced

Improving durability and reducing environmental impact with fly-ash PC bridges

First written in FY2016. 6 of 7 entries say "Advanced", first in FY2023. Latest entry: FY2026.

7entries
11years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2016AdvancedFY2023 – FY20262016: 120162017: 020172018: 020182019: 020192020: 020202021: 020212022: 020222023: 120232024: 120242025: 120252026: 32026
Same theme, other companies
Technology for Expanding Applications and Ensuring Stable Supply of Coal Ash-Based Blended MaterialsA theme 5 companies write about · 0 as a headwind · 6 as a tailwind

2 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「We developed Steamless Precast Concrete, which achieves the required early strength without steam curing, and it was commercialized in fiscal 2025 for precast PC girders ordered by the Tohoku Regional Development Bureau, bringing the number of applications to 2. By fiscal 2025, 2 plants had obtained JIS certification for precast PC girders using Steamless Precast Concrete, and we are rolling it out to all plants.」

    Steamless Precast Concrete progressed to its 2nd commercial application, and the number of plants with JIS certification reached 2.
  2. FY2025AdvancedAnnual report

    「We developed Steamless Precast Concrete, which achieves the required early strength without steam curing, and it was first adopted in fiscal 2024 for precast PC girders ordered by Okayama Prefecture. In addition, we are replacing at least 70% of the cement used in concrete materials, which emits substantial CO2 during manufacture, with blast-furnace slag fine powder, which produces lower CO2 emissions,」

    The environmentally friendly concrete that eliminates the need for steam curing was first adopted in fiscal 2024 for precast PC girders ordered by Okayama Prefecture. We are also advancing development of technology to replace at least 70% of cement with blast-furnace slag fine powder.
  3. FY2024AdvancedAnnual report

    「We developed and commercialized fast-setting concrete for precast components that develops high early strength at ambient temperature, making steam curing unnecessary.」

    Fast-setting concrete that eliminates the need for steam curing progressed from manufacturing tests and consideration of commercialization in the previous fiscal year to the commercialization stage.
  4. FY2023AdvancedAnnual report

    「Previously, precast components were steam-cured to accelerate the development of concrete's early strength during manufacture. Because steam curing uses boilers fueled by heavy oil, it produces substantial CO2 emissions. We therefore developed a fast-setting concrete for precast components that develops high early strength at ambient temperature, making steam curing unnecessary. Manufacturing tests on the components have been completed, and we are considering commercialization.」

    Efforts to reduce environmental impact have progressed beyond the use of supplementary materials such as fly ash to completion of manufacturing tests and consideration of commercialization for fast-setting concrete that eliminates the need for steam curing.
  5. FY2016First statedAnnual report

    「We are constructing a PC girder bridge using fly ash at the Miyasaka Pedestrian Bridge in Ishikawa Prefecture. Going forward, we will continue promoting the use of fly-ash PC bridges and contribute to the development of high-quality social infrastructure and conservation of the global environment.」

    The company is using fly ash to improve the durability of PC structures, reduce CO2 emissions and utilize previously unused resources.
Moved together

"Average payout ratio of at least 23% during the medium-term management plan period" moved the same way as this thread, in the same document, in 6 of its 7 moves.

665543★123456
  1. ★This thread
  2. 1Average payout ratio of at least 23% during the medium-term management plan period6×
  3. 2Improving employee benefits and securing and developing personnel to support business strategy6×
  4. 3Improvements in Operating Profit, Ordinary Profit and Net Profit and Increase in Equity Ratio5×
  5. 4Use of retained earnings for new construction methods and technologies, plant reconstruction, and information-related investments5×
  6. 5Focus on Large-Scale Upgrades, Maintenance and PC Construction4×
  7. 6Realizing the New Long-Term Vision through Medium-Term Management Plan 2025 (Fiscal 2025 to Fiscal 2027)3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for PS Construction yet. It last moved in the Earnings presentation of 2026-06-03: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Improving durability and reducing environmental impact with fly-ash PC bridges | PS Construction Co.,Ltd. (1871) | Komori