Development of a half-width construction method for bridge deck replacement

First written in FY2016. 2 of 3 entries say "Advanced", first in FY2018. Latest entry: FY2026.

3entries
11years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2016AdvancedFY2018 – FY20262016: 120162017: 020172018: 120182019: 020192020: 020202021: 020212022: 020222023: 020232024: 020242025: 020252026: 12026
Same theme, other companies
Allocation of Management Resources to Bridge Deck-Related ActivitiesA theme 4 companies write about · 0 as a headwind · 9 as a tailwind

2 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「For replacement precast PC bridge decks, we developed the S-MuSSL method, which reduces the joint width to approximately one-quarter of that used in the conventional MuSSL method by placing S-DUCCS, a high-strength, fiber-reinforced mortar developed by the company that cures at ambient temperature, at the joints between precast PC bridge decks. Construction is scheduled at a site in Okayama Prefecture in fiscal 2026.」

    The bridge deck renewal method has evolved into the S-MuSSL method, reducing the joint width to approximately one-quarter of that of the conventional method, with on-site construction scheduled for fiscal 2026.
  2. FY2018AdvancedAnnual report

    「Because this type of structure is required to undergo a wheel-load running test confirming performance equivalent to a 100-year service life, we conducted the test in the previous fiscal year and confirmed the required performance. Based on these results, the method is being applied to actual construction on the Chugoku Expressway in the current fiscal year, and application on the Tomei Expressway is also planned.」

    For the MuSSL method for bridge deck replacement, performance equivalent to a 100-year service life has been confirmed. The method has been applied to actual construction on the Chugoku Expressway, and application on the Tomei Expressway is planned.
  3. FY2016First statedAnnual report

    「To minimize the risks associated with traffic restrictions, we developed a half-width deck replacement method. As a result, the method was adopted for the deck replacement work on the outbound lane of the Doyatani No. 2 Bridge on the Chugoku Expressway, a designated renewal project, and we are currently carrying out the construction.」

    To address demand for bridge renewal, the company developed a method that limits the impact of traffic restrictions and has adopted and implemented it on a specific project.
Moved together

"Improving employee benefits and securing and developing personnel to support business strategy" moved the same way as this thread, in the same document, in 2 of its 3 moves.

222★123
  1. ★This thread
  2. 1Improving employee benefits and securing and developing personnel to support business strategy2×
  3. 2Development and Adoption of Remote Monitoring Systems for Cathodic Protection2×
  4. 3Development of a Cost-Effective Joining Method for Precast Construction2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for PS Construction yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.