Kumagai Gumi (1861) · InitiativeAdvanced
Entering the offshore wind construction market through joint ownership of an SEP vessel
First written in FY2025. 3 of 4 entries say "Advanced", first in FY2026-H1. Latest entry: 2026-07-31.
4entries
2years
1from disclosures
How it moved
Same theme, other companies
Entry into the Wind-Power-Related Facility Construction BusinessA theme 4 companies write about · 0 as a headwind · 4 as a tailwind
2 other companies' latest entry also says "Advanced".
Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
- 2026-07-31AdvancedGovernance
「The Company aims to enter the construction business for fixed-bottom offshore wind projects in various parts of Japan by towing the vessel to Japan during FY2027 and using its home port of Hakodate as its base.」
Provides specific details on the policy of entering the offshore wind construction business, including the timing of towing the jointly owned self-elevating platform vessel to Japan and its base of operations. - FY2026AdvancedAnnual report
「当社が共同保有している大型SEPの改造も進んでおり、2027年夏季には日本へ曳航予定である。」
洋上風力建設工事への参入について、共同保有する大型SEPの改造が進み、2027年夏季の日本曳航予定まで具体化した。国内着床式への参入に加え、浮体式の技術開発も進めている。 - FY2026-H1AdvancedAnnual report
「(1) 銘柄 株式会社熊谷組第1回無担保社債(社債間限定同順位特約付)(グリーンボンド) (2) 発行総額 8,500百万円 (7) 使途 自己昇降式作業台船(SEP船)に関する投資のリファイナンス資金として、コマーシャル・ペーパー償還資金に充当」
SEP船を用いた洋上風力建設工事への参入に関する投資について、総額85億円のグリーンボンドによるリファイナンスを決議した。SEP関連投資の資金調達が具体化している。 - FY2025First statedAnnual report
「A consortium of 6 general contractors and marine contractors, including the Company, will jointly own a self-elevating platform (SEP) essential for construction work and enter the offshore wind market.」
The Company disclosed a specific new measure to enter construction of fixed-bottom and floating offshore wind facilities through joint ownership of an SEP by a 6-company consortium. The SEP is being modified for larger turbines in preparation for full-scale construction from around 2027.