CO2 Emissions Reduction Through Low-Carbon Construction
First written in FY2016. 5 of 9 entries say "Advanced", first in FY2017. Latest entry: FY2025.
The whole theme swung hardest in 2025: 2 of 6 companies on the "Worse" side.
0 other companies' latest entry also says "Achieved".
- FY2025AchievedAnnual report
「The Scope 1 + 2 gross reduction target under the Medium-Term Management Plan 2024 Rolling Plan, with fiscal 2024 as the target year, was exceeded based on fiscal 2024 results, with a reduction of 28.5%, achieving the target.」
The fiscal 2024 Scope 1 and 2 gross reduction target was achieved based on actual results. However, Scope 1 and 2 emissions intensity for construction work was 11.3t-CO2/¥100 million, slightly below the target of no more than 11.2. - FY2024AdvancedAnnual report
「The Scope 1 + 2 gross reduction target under the Medium-Term Management Plan 2024 Rolling Plan, with fiscal 2024 as the target year, was achieved ahead of schedule based on fiscal 2023 results.」
The fiscal 2024 Scope 1 and 2 gross reduction target was achieved ahead of schedule based on fiscal 2023 results. Emissions were 65.6 thousand t-CO2, down 29.9% from the base year. - FY2023AdvancedAnnual report
「The Scope 1 + 2 gross reduction target under the Medium-Term Management Plan 2024 Rolling Plan, with fiscal 2024 as the target year, was achieved ahead of schedule based on fiscal 2022 results.」
The company stated that it achieved its fiscal 2024 Scope 1 and 2 target ahead of schedule based on fiscal 2022 results, and disclosed gross emissions of 80.0 thousand t-CO2, down 14.5% from the base year. - FY2022RaisedAnnual report
「CO2 emissions: Scope 1 + 2; reduction rate (from fiscal 2020): at least 16.8%; intensity (/¥100 million): no more than 11.2t-CO2; Scope 3; reduction rate (from fiscal 2020): at least 10.0%.」
The company reviewed its CO2 reduction targets under the rolling plan and expanded the fiscal 2024 targets to cover Scope 3, emissions intensity and emissions during the building-operation phase, in addition to Scope 1 and 2. - FY2020AdvancedAnnual report
「CO2 emissions from worksites in fiscal 2019 were 75,041t-CO2, down 61% from the base year, while emissions intensity was 14.78t-CO2/¥100 million, down 48.2% from the base year.」
The company updated its fiscal 2019 emissions and emissions-intensity results while maintaining its targets of a 70% reduction by 2030 and an 80% reduction by 2050. - FY2019AdvancedAnnual report
「CO2 emissions from work sites in fiscal 2018 were 72,703t-CO2, down 62.3% from the base year, while CO2 emissions intensity was 14.2t-CO2/¥100 million, down 50.2% from the base year.」
The company maintained its targets of reducing emissions by 70% by 2030 and 80% by 2050, while updating its fiscal 2018 emissions and emissions intensity results. It also reported SBTi certification, membership in RE100, and selection for the CDP Climate Change A List. - FY2018RaisedAnnual report
「Under its renewed certification, the company has committed to reducing total CO2 emissions generated during construction by 70% from 1990 levels by 2030 and by 80% by 2050, among other commitments.」
In addition to the previous 2020 target of a 40% reduction, the company set longer-term and more ambitious targets of 70% by 2030 and 80% by 2050. CO2 emissions in fiscal 2017 were down 62.9% from the base year, while emissions intensity was down 41.4%. - FY2017AdvancedAnnual report
「CO2 emissions from work sites in fiscal 2016 were 68,719t-CO2, down 64.27% from the base year, while CO2 emissions intensity was 17.52t-CO2/¥100 million, down 38.6% from the base year. The company has been working toward its 2020 target of reducing both CO2 emissions and CO2 emissions intensity by 40% from 1990 levels.」
The company disclosed fiscal 2016 results under its low-carbon construction system. CO2 emissions fell 64.27% from the base year, while emissions intensity fell 38.6%. The 2020 target of a 40% reduction remains in place. - FY2016First statedAnnual report
「The company has been working toward its 2020 target of reducing both CO2 emissions and CO2 emissions intensity by 40% from 1990 levels.」
The company uses the low-carbon construction system (TO-MINICA) at work sites nationwide and has set a 2020 target of reducing both CO2 emissions and CO2 emissions intensity by 40% from 1990 levels.