ZEB renovation of the Comprehensive Construction Technology Center
First written in FY2023. 1 of 2 entries say "Achieved", first in FY2024. Latest entry: FY2024.
No other company in this theme has enough history to compare yet.
- FY2024AchievedAnnual report
「Under BELS (Building Energy-Saving Performance Labeling System), the Research Center Building, formerly the Research Management Building, obtained ZEB certification, while the Research Management Building, formerly the General Laboratory Building, obtained ZEB Ready certification. The retrofit construction was completed in May 2024.」
The planned ZEB retrofit of the Comprehensive Construction Technology Center was completed, resulting in the acquisition of ZEB and ZEB Ready certifications. - FY2023First statedAnnual report
「The planned ZEB retrofit will strengthen the insulation and solar shading performance of exterior walls and windows, introduce LED lighting and high-efficiency air-conditioning systems, and install energy-saving controls combining various sensors with a BEMS (Building Energy Management System), as well as solar power generation and battery storage facilities. Following the retrofit, each building is expected to achieve primary energy savings of at least 50% versus benchmark energy consumption. Under BELS, the Research Management Building is scheduled to obtain ZEB certification, while the General Laboratory Building is aiming for ZEB Ready certification.」
For the ZEB retrofit launched in November 2022 and scheduled for completion in fiscal 2023, the company plans to achieve energy savings of at least 50%, obtain ZEB and ZEB Ready certification, and introduce insulation, high-efficiency equipment, BEMS, solar power generation and battery storage.