Haseko (1808) · InitiativeAdvanced
Development and rollout of the BIM system developed by 長谷工
First written in FY2017. 4 of 6 entries say "Advanced", first in FY2018. Latest entry: FY2025.
6entries
9years
0from disclosures
How it moved
Same theme, other companies
Enhancing and streamlining design and construction management through the launch of the BIM Promotion OfficeA theme 26 companies write about · 0 as a headwind · 34 as a tailwind
The whole theme swung hardest in 2022: 1 of 11 companies on the "Worse" side.
11 other companies' latest entry also says "Advanced".
Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 26 companies compared. The sentences above are computed from all 26.Full recordFilings, disclosures and news, newest first
- FY2025AdvancedAnnual report
「各種施工図の自動作成、根伐土量算出、コンクリート数量算出、仮設足場材自動拾いなどを実現しております。」
長谷工版BIMは全案件採用体制の構築後、施工図作成、土量・コンクリート数量算出、仮設足場材拾いなどの自動化を実現している。 - FY2023AdvancedAnnual report
「根伐図の自動作成、根伐土量自動算出、基礎・基準階コンクリート数量算出、仮設足場材自動積算などを実現しております。」
長谷工版BIMは全案件採用体制の構築後、図面作成、土量・数量算出、仮設材積算などの自動化機能の実現段階へ進展した。 - FY2020AchievedAnnual report
「当社設計・施工案件における「長谷工版BIM」採用の実施設計案件は7割を超えており、2020年3月末には全案件で採用する体制構築を完了しました。」
前期に示した2020年3月末までの全案件採用体制の構築が完了した。実施設計案件の採用率は7割を超え、BIMデータを活用した施工技術開発へ次段階が示された。 - FY2019AdvancedAnnual report
「当社設計・施工案件における「長谷工版BIM」採用の実施設計案件は5割を超えており、2020年3月末には全案件で採用する体制を構築する予定です。」
長谷工版BIMは実施設計案件の採用率が5割を超え、2020年3月末までに全案件で採用する体制構築という期限付き計画が示された。 - FY2018AdvancedAnnual report
「販売シーンにおける活用の為BIMモデルからVR(バーチャルリアリティ)コンテンツを作成する「長谷工オリジナルBIMビューワー」システムを開発いたしました。第一号案件として「ルネ八王子トレーシア」(東京都八王子市、地上15階、86戸)にて採用しております。」
長谷工版BIMはツール・業務環境の整備段階から、VRコンテンツを含む独自ビューワーの開発と第1号案件への採用段階へ進展した。 - FY2017First statedAnnual report
「建設BIM推進部を設置し、設計・施工及びグループ企業の現業部門と緊密に連携した「長谷工版BIM」のツール開発や環境整備等を強力に推進しております。」
BIM推進部を設置し、設計・施工案件での採用を増やすとともに、既築リフォームやVR販売への活用にも着手している。