Haseko (1808) · RiskWorsened
Rising Construction Costs, Labor Shortages and Construction Delays Due to Climate Change
First written in FY2023. 1 of 2 entries say "Worsened", first in FY2025. Latest entry: FY2025.
2entries
3years
0from disclosures
How it moved
Same theme, other companies
Climate Change-Related Construction Site Damage and Deteriorating Working ConditionsA theme 3 companies write about · 3 as a headwind · 0 as a tailwind
Haseko moved to the "Worse" side of this theme in 2025.
0 other companies' latest entry also says "Worsened".
Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
- FY2025WorsenedAnnual report
「また、物理的リスクとして、夏季平均気温の上昇に伴う建設現場や物件開発工事現場の生産性低下や、気象災害の頻発・激甚化に伴う建設工事の遅延発生、保有物件被災に伴う復旧コスト発生のケースで、業績及び財政状態に悪影響を及ぼす可能性があります。」
気候変動リスクの対象が建設現場だけでなく物件開発工事現場、保有物件の被災・復旧コストへ拡大した。 - FY2023First statedAnnual report
「脱炭素社会への移行リスクとしては、炭素税の導入や各種規制強化により建設原価が上昇し、業績及び財政状態に悪影響を及ぼす可能性があります。また、物理的リスクとして、夏季平均気温の上昇に伴う建設現場の生産性低下や気象災害の頻発・激甚化に伴う建設工事の遅延が発生した場合、業績及び財政状態に悪影響を及ぼす可能性があります。」
気候変動について、炭素税・規制強化による建設原価上昇、気温上昇による生産性低下、気象災害による工事遅延を主要リスクとして新たに独立して記載した。