Komori
Ohmoto Gumi (1793) · InitiativeAdvanced

Practical Implementation of Architectural Design BIM and Construction BIM

First written in FY2024. 2 of 3 entries say "Advanced", first in FY2025. Latest entry: FY2026.

3entries
3years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2024AdvancedFY2025 – FY20262024: 120242025: 120252026: 12026
Same theme, other companies

The whole theme swung hardest in 2022: 1 of 11 companies on the "Worse" side.

11 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 26 companies compared. The sentences above are computed from all 26.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「施工BIMモデルを活用することで、現況地盤や計画勾配を反映した精度の高い土量算出を行い、無駄のない残土転用計画を実現しました。…躯体施工図化や、配筋納まり検討図の作図、設備ラック・配管・ダクト等の重ね合わせによる干渉チェックを稼働現場にて試験的に運用」

    BIMが設計施工一貫利用の方針から、土量算出・残土転用計画、施工図化、配筋検討、干渉チェックの実運用段階へ進んでいる。
  2. FY2025AdvancedAnnual report

    「2024年度からは、設計施工一貫利用BIMを目指すとともに、設計プロセスの効率化、ビジュアルプレゼンテーション力の強化、構造計算書と図面・数量の整合確認など、より具体的で実践的な取り組みを開始しております。」

    BIMの環境整備・研修段階から、設計施工一貫利用、土量算出、施工図化、配筋検討、干渉チェック等の実用化段階へ進んでいる。
  3. FY2024First statedAnnual report

    「2024年度以降は、設計施工一貫利用BIMを目指すとともに、設計プロセスの効率化、ビジュアルプレゼンテーション力の強化、構造計算書と図面・数量の整合確認など、より具体的で実践的な取り組みを開始する予定であります。」

    2022年からのBIM環境整備・研修を踏まえ、2024年度以降の設計施工一貫利用、設計効率化、プレゼンテーション強化、整合確認を新たな実用化テーマとして示している。
Moved together

"Introduction of performance-based and restricted stock compensation" moved the same way as this thread, in the same document, in 2 of its 3 moves.

222222★123456
  1. ★This thread
  2. 1Introduction of performance-based and restricted stock compensation2×
  3. 2Long-Term Vision 2036 and Medium-Term Management Plan (Fiscal Years 2024–2026)2×
  4. 3Policy of limiting directors’ remuneration to fixed basic remuneration only2×
  5. 4Oversight and Auditing by Outside Directors and Outside Audit & Supervisory Board Members2×
  6. 5Productivity Improvement through i-Construction Initiatives and the Use of 3D Models2×
  7. 6Proper Management of Working Hours and Productivity Improvement Through Work-Style Reform2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Ohmoto Gumi yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.