Komori
Oriental Shiraishi (1786) · InitiativeRestated

Labor-Saving Bridge Construction Using Precast Components and Automated Quality Control

First written in FY2021. 2 of 3 entries say "Restated". Latest entry: FY2026.

3entries
6years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2021 – FY20262021: 120212022: 020222023: 120232024: 020242025: 020252026: 12026
Same theme, other companies
Labor-saving bridge construction through precasting and automated quality controlA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2026RestatedAnnual report

    「To address the aging of bridges and other social infrastructure, the company is advancing further development, improvement and implementation of the SLJ Slab Method for deck replacement, the MeL Slab Method using precast PC decks made of nonferrous materials, the SCBR Method for girder replacement, dVIP Girders with improved maintainability, the SP Slump Method using precast components for deck replacement on PC composite girders, and electrochemical repair methods. It is also developing materials with superior filling and corrosion-protection performance for the PC-Rev Method of re-injecting PC grout.」

    The company continues to develop and improve a range of technologies involving precast decks, repair materials and labor-saving construction methods.
  2. FY2023RestatedAnnual report

    「The company is considering ways to improve productivity, including expanding the application of labor-saving technologies that make extensive use of precast components, such as the SCBR Method and precast parapets, safety management using IoT technologies, and vibration-compaction control using AR environments, and is deploying and improving these technologies in actual construction projects.」

    The company continues to pursue labor-saving construction and quality control for bridges using precast components, IoT and AR.
  3. FY2021First statedAnnual report

    「The company is considering ways to improve productivity, including expanding the application of labor-saving technologies that make extensive use of precast components, such as the SCBR Method and precast parapets, automated quality-control methods for PC grout, and automation in production operations, with several technologies being deployed in actual construction projects.」

    The company is using precast components, automated quality control and automation in production operations to improve productivity.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
No upcoming earnings preview for Oriental Shiraishi yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.