Komori
Yamaura (1780) · RiskRestated

Risk of Liability for Damages and Reputational Damage Due to Inadequate Quality

First written in FY2024. 2 of 3 entries say "Restated". Latest entry: FY2026-H1.

3entries
2years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2024 – FY2026-H12024: 120242025: 22025
Same theme, other companies
Housing and Real Estate Construction Defect and Defect Liability RiskA theme 104 companies write about · 104 as a headwind · 4 as a tailwind

The whole theme swung hardest in 2026: 7 of 39 companies on the "Worse" side.

58 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 104 companies compared. The sentences above are computed from all 104.
Full recordFilings, disclosures and news, newest first
  1. FY2026-H1RestatedAnnual report

    「No new business or other risks arose during the current interim consolidated accounting period. There were also no material changes to the business and other risks described in the securities report for the previous fiscal year.」

    The company states that there have been no new or significant changes to the business and other risks described in the previous fiscal year, including the risks of damages, loss of credibility, and construction delays arising from improper construction and inspections.
  2. FY2025RestatedAnnual report

    「If quality problems arise due to construction that fails to meet the client's requirements, construction that differs from the design, or improper inspections, they could adversely affect business performance and financial condition through damages, loss of social credibility, construction delays, and other consequences.」

    The company continues to address the risks of damages, loss of credibility, and construction delays arising from improper construction and inspections, as well as preventive measures such as front-loading.
  3. FY2024First statedAnnual report

    「If quality problems arise due to construction that fails to meet the client's requirements, construction that differs from the design, or improper inspections, they could adversely affect business performance and financial condition through damages, loss of social credibility, construction delays, and other consequences.」

    The company has for the first time separately identified quality problems caused by improper construction and inspections as a business and other risk, and describes preventive measures including front-loading, record management, and site patrols.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
No upcoming earnings preview for Yamaura yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.