Transition to Renewable Electricity at Facilities, Vehicle Electrification, and Conversion of Asphalt Plants to Gas Fuel
First written in FY2024. 1 of 3 entries say "Restated". Latest entry: FY2026.
The whole theme swung hardest in 2022: 1 of 7 companies on the "Worse" side.
14 other companies' latest entry also says "Advanced".
- FY2026AdvancedAnnual report
「We started a project to convert this fuel to gas in fiscal 2024, and the facility was completed in fiscal 2025.」
The company has disclosed that the facility for the asphalt plant fuel gas conversion project was completed in fiscal 2025. - FY2025RestatedAnnual report
「By using solar power generation installed at our own facilities and Shinshu Green Electricity generated at hydroelectric power plants operated by the Nagano Prefectural Enterprise Bureau and elsewhere, we meet 100% of the electricity needs of our head office, branches in Nagano Prefecture, and other related facilities with renewable energy, amounting to more than 1,000,000 kWh annually.」
The company is supplying 100% renewable electricity to its facilities, consuming more than 1,000,000 kWh annually, while replacing vehicles with EVs and hybrid vehicles and converting asphalt plant fuel to gas. - FY2024First statedAnnual report
「By using solar power generation installed at our own facilities and Shinshu Green Electricity generated at hydroelectric power plants operated by the Nagano Prefectural Enterprise Bureau and elsewhere, we meet 100% of the electricity needs of our head office, branches in Nagano Prefecture, and other related facilities with renewable energy, amounting to more than 1,000,000 kWh annually. We will start a project to convert this fuel to gas in fiscal 2024.」
The company indicates that it supplies 100% renewable electricity to its facilities, consuming more than 1,000,000 kWh annually, is replacing vehicles with EVs and hybrid vehicles, and will begin converting asphalt plant fuel to gas in fiscal 2024.