Takamatsu Construction Group (1762) · InitiativeAchieved

Replacement of the Tokyo Office Building (TCG Building)

First written in FY2020. 3 of 8 entries say "Advanced", first in FY2021-Q3. Latest entry: FY2024.

8entries
5years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2020AdvancedFY2021-Q3 – FY2023OtherFY2024-Q1 – FY2024-Q32020: 120202021: 120212022: 120222023: 320232024: 22024
Same theme, other companies
Reconstruction of the Former Head Office BuildingA theme 20 companies write about · 0 as a headwind · 20 as a tailwind

The whole theme swung hardest in 2026: 1 of 6 companies on the "Worse" side.

8 other companies' latest entry also says "Achieved".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 20 companies compared. The sentences above are computed from all 20.
Full recordFilings, disclosures and news, newest first
  1. FY2024AchievedAnnual report

    「The Company has also installed a power self-sufficiency system combining solar power generation equipment and storage batteries at its new Tokyo head office building, completed in May 2023,」

    The Tokyo head office building was completed in May 2023, and a power self-sufficiency system combining solar power generation equipment and storage batteries was installed.
  2. FY2024-Q3Increase in recognized relocation expensesAnnual report

    「Office relocation expenses − 530」

    Office relocation expenses associated with the move to the new headquarters building increased from ¥508 million in the cumulative previous quarter to ¥530 million.
  3. FY2024-Q2Cumulative recognition of relocation expensesAnnual report

    「Office relocation expenses − 508」

    The Company recognized ¥508 million in office relocation expenses associated with the move to the new headquarters building, and related payments totaled ¥497 million.
  4. FY2024-Q1New head office relocation costs incurredAnnual report

    「Net loss attributable to owners of the parent was ¥153 million due to relocation costs for the new head office.」

    Relocation costs of ¥454 million associated with moving to the new head office were recorded as an extraordinary loss and contributed to the quarterly net loss.
  5. FY2023AdvancedAnnual report

    「Total capital investment during the current consolidated fiscal year was ¥7,409 million, the main component of which was construction costs for the Tokyo Head Office Building currently under construction by the company.」

    Capital investment of ¥7,409 million was made, primarily for construction of the Tokyo Head Office Building, and the redevelopment plan has progressed.
  6. FY2022AdvancedAnnual report

    「Total capital investment during the current consolidated fiscal year was ¥5,238 million, the main component of which was construction costs for the Tokyo Office Building currently under construction by the company.」

    Capital investment of ¥5,238 million, including construction of the Tokyo Office Building, was made, bringing the amount already paid for the building investment to ¥5,632 million.
  7. FY2021-Q3AdvancedAnnual report

    「Tokyo Office Building (Minato-ku, Tokyo) Office building Land 10,980 10,919 Internal funds and borrowings and bonds September 2020 February 2023 Building 11,374 1,352」

    Redevelopment of the Tokyo Office Building commenced in September 2020, with completion scheduled for February 2023. Planned total investment was ¥10,980 million for the land and ¥11,374 million for the building, with financing methods including bonds described.
  8. FY2020First statedAnnual report

    「Tokyo Office Building (Minato-ku, Tokyo) Office building Undecided 10,741 Internal funds and borrowings During fiscal 2020 (planned) During fiscal 2022 (planned)」

    Regarding the redevelopment of the Tokyo Office Building, the site had already been acquired, and the project was described as a capital investment plan scheduled to commence in fiscal 2020 and be completed in fiscal 2022. The total investment remains undecided because the building plan has not been finalized, and ¥10,741 million had already been paid.
Moved together

"Revenue and Profit Growth in the Real Estate Business" moved the same way as this thread, in the same document, in 3 of its 8 moves.

333322★123456
  1. ★This thread
  2. 1Revenue and Profit Growth in the Real Estate Business3×
  3. 2Technologies to Improve the Seismic Performance of Existing Bridges3×
  4. 3Development of Seismic Retrofitting Technologies and Expansion of Their Application Scope3×
  5. 4Dividend for the fiscal year ended March 2017 and 25% target for the consolidated payout ratio3×
  6. 5Record Highs for Order Intake and Net Sales2×
  7. 6Year-on-year decline in quarterly order intake2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Takamatsu Construction Group yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.