Komori
Hazama Ando (1719) · InitiativeAdvancedLatest Governance (2026-10-01): "Restated"

Social infrastructure foundations and energy management from new construction through maintenance and renewal

First written in FY2018. 10 of 13 entries say "Advanced", first in FY2019. Latest entry: 2026-10-01.

13entries
9years
5from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2019 – FY20262018: 120182019: 120192020: 220202021: 120212022: 020222023: 120232024: 020242025: 120252026: 62026
Same theme, other companies

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. 2026-10-01RestatedGovernance

    「2026年1月5日付で、シンガポールの建設会社「QXY Resources Pte. Ltd.」の全株式を取得しました。」

    東南アジアでの海外事業基盤強化とQXY Resourcesの子会社化を、長期的な事業成長の事例として再掲している。
  2. FY2026AdvancedAnnual report

    「This is the company's 10th on-site solar PPA, bringing the total capacity of projects already in operation to 6.7 MW.」

    The on-site solar PPA is the company's 10th, and the total capacity of projects already in operation has reached 6.7 MW. Including the start of commercial operations at the Sakaide Biomass Power Plant, the commercialization of the energy business is progressing.
  3. FY2025AdvancedAnnual report

    「In its non-construction businesses, the company entered the grid-scale battery storage business as part of its renewable energy business, in addition to its other initiatives.」

    The renewable energy-related business has progressed from energy management and renewable energy demonstration projects to entry into the grid-scale battery storage business.
  4. FY2023AdvancedAnnual report

    「During the consolidated fiscal year, the company conducted an operational demonstration of a power generation plant combining a hydrogen-compatible fuel cell, gas-engine power generation equipment and a large-capacity sodium-sulfur battery. By effectively using waste heat from the generators, the company self-wheeled lower-CO2 electricity to the PCa plant of its consolidated subsidiary Ando Hazama Kogyo Co., Ltd. and to a large-scale civil engineering site, reducing CO2 emissions at 3 locations.」

    The next-generation energy project has progressed to operational demonstration of a power generation plant, self-wheeling to 3 locations including a PCa plant and a large-scale civil engineering site, and CO2 emissions reduction.
  5. FY2021AdvancedAnnual report

    「The Group achieved results through demonstration of the next-generation energy management system, an environmental technology for a decarbonized society, and Nearly ZEB (75% energy savings), as well as efforts to commercialize renewable energy businesses.」

    The company is reporting results for the first year of the plan in its initiatives involving next-generation energy management, Nearly ZEB and the commercialization of renewable energy businesses.
  6. FY2020AdvancedAnnual report

    「As one initiative to help resolve Japan's energy issues, the company launched the Ando Hazama Next-Generation Energy Project in September 2018 and began demonstration testing in April 2020.」

    The next-generation energy management initiative has progressed from project launch to the start of demonstration testing at multiple facilities.
  7. FY2020-Q3RaisedAnnual report

    「Non-construction business: Establishing energy-related businesses as a core earnings source」

    The company has expanded the scope and objectives of its initiatives from next-generation energy management to a policy of making energy-related businesses the core of its non-construction operations and an earnings source.
  8. FY2019AdvancedAnnual report

    「During the fiscal year, the company launched the Ando Hazama Next-Generation Energy Project, which aims to build and operate a next-generation energy management system. The project was selected in August 2018 for the Ministry of Land, Infrastructure, Transport and Tourism's FY2018 first Sustainable Building Leadership Project (CO2 reduction leadership category).」

    The priority initiative for next-generation energy management has progressed from selection for a Ministry of Land, Infrastructure, Transport and Tourism project to the launch of a specific project.
  9. FY2018First statedAnnual report

    「Building foundations to broadly support social infrastructure, from new construction through maintenance and renewal. Strengthening efforts to develop next-generation social infrastructure. Promoting energy management with a view to using next-generation energy.」

    The new plan identifies as priority measures broad support for social infrastructure from new construction through maintenance and renewal, development of next-generation social infrastructure, and energy management with a view to next-generation energy.
Moved together

"Decline in Cash Flow From Operating Activities and Cash Balances" moved the same way as this thread, in the same document, in 7 of its 13 moves.

776666★123456
  1. ★This thread
  2. 1Decline in Cash Flow From Operating Activities and Cash Balances7×
  3. 2Development of Labor-Saving and Automation Technologies Using ICT and AI7×
  4. 3Continued Investment in Research and Development6×
  5. 4Impact of foreign exchange losses on earnings6×
  6. 5A stronger equity base and a stable, strengthened management and financial foundation6×
  7. 6Enhancing Construction Capacity Through PCa Plants, Construction Machinery and BIM/CIM6×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Hazama Ando's next results are scheduled for 2026-11-12. Read the earnings preview It last moved in the Governance of 2026-10-01: "Restated".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Social infrastructure foundations and energy management from new construction through maintenance and renewal | HAZAMA ANDO CORPORATION (1719) | Komori