Japan Petroleum Exploration (1662) · InitiativeAchieved

Introduction of a 1,500 m-Class Drilling Rig

First written in FY2023. 2 of 5 entries say "Softened", first in FY2025-H1. Latest entry: FY2026-H1.

5entries
3years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2023AdvancedFY2024SoftenedFY2025-H1 – FY20252023: 120232024: 220242025: 22025
Same theme, other companies
Enhancement of Geotechnical Investigation and Construction EquipmentA theme 3 companies write about · 0 as a headwind · 3 as a tailwind

0 other companies' latest entry also says "Achieved".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026-H1AchievedAnnual report

    「In addition, among the plans for new construction and other additions to major facilities at the end of the previous consolidated fiscal year was エスケイエンジニアリング㈱'s 1,500m-class drilling rig, a consolidated subsidiary of the company (locations: head office and branches in Chiyoda-ku, Tokyo; Tomakomai, Hokkaido; Akita, Akita; and Nagaoka, Niigata; work commenced: May 2023). The project was completed in October 2025.」

    The plan to introduce the 1,500m-class drilling rig was completed in October 2025 after the scheduled completion date was postponed.
  2. FY2025SoftenedAnnual report

    「エスケイエンジニアリング㈱'s 1,500m-class drilling rig (scheduled completion: September 2024) is now scheduled for completion by September 2025 due to production delays.」

    The scheduled completion of the 1,500m-class drilling rig was postponed further, from March 2025 to September 2025.
  3. FY2025-H1SoftenedAnnual report

    「For エスケイエンジニアリング㈱'s 1,500m-class drilling rig (scheduled completion: September 2024), the scheduled completion date has been changed to March 2025 following a schedule review.」

    The scheduled completion of the 1,500m-class drilling rig was postponed from September 2024 to March 2025.
  4. FY2024AdvancedAnnual report

    「1,500m-class drilling rig 1,900 1,362 Internal funds and borrowings from the parent company From May 2023 To September 2024」

    The plan to introduce the 1,500m-class drilling rig has progressed, with total planned investment of ¥1.9 billion and ¥1.362 billion already paid, and completion scheduled for September 2024.
  5. FY2023First statedAnnual report

    「1,500m-class drilling rig 1,560 0 Internal funds and borrowings from the parent company From May 2023 To September 2024」

    エスケイエンジニアリング disclosed a plan to introduce a 1,500m-class drilling rig for ¥1.56 billion.
Moved together

"Risk of Changes in Mine Closure Costs and Asset Retirement Obligations After the End of Production" moved the same way as this thread, in the same document, in 3 of its 5 moves.

322222★123456
  1. ★This thread
  2. 1Risk of Changes in Mine Closure Costs and Asset Retirement Obligations After the End of Production3×
  3. 2Increased production through joint development of U.S. tight oil2×
  4. 3Risk of Inability to Pass Higher LNG Procurement Costs Through to Sales Prices2×
  5. 4Uncertainty in reserve estimates and the potential for future revisions2×
  6. 5Financial Risks from Large-Scale Investments in Overseas Projects and Debt Guarantees2×
  7. 6Production start at the UK North Sea Seagull field at the end of 20212×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Japan Petroleum Exploration yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Introduction of a 1,500 m-Class Drilling Rig | Japan Petroleum Exploration Co.,Ltd. (1662) | Komori