Columbia Works (146A) · RiskWorsenedLatest Earnings presentation (2026-09-01): "Mitigated"

Subcontractor Management and Rising Construction Material Costs

First written in FY2023. 7 of 13 entries say "Worsened", first in FY2024. Latest entry: 2026-09-01.

13entries
3years
10from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2023WorsenedFY2024 – 2026-04-272024: 120242025: 120252026: 112026
Same theme, other companies
Project Progress Risks from Shortages of Materials and Equipment and Delivery DelaysA theme 41 companies write about · 43 as a headwind · 0 as a tailwind

Columbia Works moved to the "Worse" side of this theme in 2025, 3 years after the typical company in this theme (2022).

The whole theme swung hardest in 2026: 9 of 23 companies on the "Worse" side.

7 other companies' latest entry also says "Mitigated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 41 companies compared. The sentences above are computed from all 41.
Full recordFilings, disclosures and news, newest first
  1. FY2025WorsenedAnnual report

    「We work to contain cost increases and construction delays by improving the accuracy of estimates, securing multiple candidate construction companies and optimizing schedules and specifications. However, if construction costs increase or delays occur despite these measures, our group’s results and financial condition could be affected through lower profitability of development projects and delayed delivery.」

    The construction cost and delay risk was classified as medium likelihood and high impact, with estimate accuracy, multiple contractors and schedule and specification optimization identified as responses.
  2. FY2024WorsenedAnnual report

    「Construction costs have remained high due to rising construction material prices and increases in labor costs resulting from the Act on the Arrangement of Related Laws to Promote Work Style Reform, which has been implemented progressively since April 2019. Managing construction costs and schedules during construction is an important issue.」

    Construction costs remain high because of higher material prices, shortages of construction engineers and higher labor costs.
  3. FY2023First statedAnnual report

    「If an outsourced contractor experiences financial difficulties or construction delays, or if construction costs increase due to higher prices for construction materials, delays and higher cost of sales could occur in our group’s real estate development services.」

    Shortages or financial difficulties among outsourced contractors, construction delays and higher material prices could delay development or increase costs.
Moved together

"Changes in Economic Conditions, Interest Rates and Land Prices" moved the same way as this thread, in the same document, in 8 of its 13 moves.

833322★123456
  1. ★This thread
  2. 1Changes in Economic Conditions, Interest Rates and Land Prices8×
  3. 2Expanding revenue opportunities through ancillary services3×
  4. 3Valuation of Real Estate Inventory and Fixed Assets3×
  5. 4Expansion of the Hotel Business under the NOCTIS Brand3×
  6. 5Solutions-Based Real Estate Development2×
  7. 6Diversification of Development Schemes2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Columbia Works yet. It last moved in the Earnings presentation of 2026-09-01: "Mitigated".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Subcontractor Management and Rising Construction Material Costs | Columbia Works Inc. (146A) | Komori