Komori
Sanyo Homes (1420) · RiskRestated

Liability for Defects and Quality Issues

First written in FY2016. 2 of 3 entries say "Restated". Latest entry: FY2018.

3entries
3years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2016 – FY20182016: 120162017: 120172018: 12018
Same theme, other companies
Liability and Response Cost Risk from Quality Deficiencies in Deliverables and ServicesA theme 80 companies write about · 81 as a headwind · 0 as a tailwind

The whole theme swung hardest in 2026: 7 of 31 companies on the "Worse" side.

43 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 80 companies compared. The sentences above are computed from all 80.
Full recordFilings, disclosures and news, newest first
  1. FY2018RestatedAnnual report

    「The Group takes every precaution in quality control for the housing business based on industrialized housing performance certification and ISO 9001 certification, but if unforeseen defect liability or other obligations arise, substantial repair costs may be incurred and the Group's reputation may be seriously damaged, potentially affecting the Group's operating results and financial condition.」

    After describing its quality certifications and control system, the Group restates the risks of repair costs and reputational damage arising from defects.
  2. FY2017RestatedAnnual report

    「The Group takes every precaution in quality control for the housing business based on industrialized housing performance certification and ISO 9001 certification, but if unforeseen defect liability or other obligations arise, substantial repair costs may be incurred and the Group's reputation may be seriously damaged, potentially affecting the Group's operating results and financial condition.」

    After describing its quality certifications and control system, the Group restates the risks of repair costs and reputational damage arising from defects.
  3. FY2016First statedAnnual report

    「The Group takes every precaution in quality control for the housing business based on industrialized housing performance certification and ISO 9001 certification, but if unforeseen defect liability or other obligations arise, substantial repair costs may be incurred and the Group's reputation may be seriously damaged,」

    After describing its quality control system, the Group identifies repair costs and reputational damage arising from unforeseen defects as risks.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
Sanyo Homes's next results are scheduled for 2026-11-11. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.