Risk of construction delays caused by typhoons and other events

First written in FY2016. 2 of 4 entries say "Materialised", first in FY2017. Latest entry: FY2026.

4entries
11years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseMaterialisedFY2017 – FY20262016: 12017: 120172018: 020182019: 020192020: 020202021: 020212022: 020222023: 020232024: 020242025: 120252026: 12026
Same theme, other companies
Risk of Construction Delays and Additional Costs Due to Natural DisastersA theme 25 companies write about · 26 as a headwind · 0 as a tailwind

West Holdings moved to the "Worse" side of this theme in 2017, 3 years before the typical company in this theme (2020).

The whole theme swung hardest in 2025: 3 of 9 companies on the "Worse" side.

1 other company's latest entry also says "Worsened".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 25 companies compared. The sentences above are computed from all 25.
Full recordFilings, disclosures and news, newest first
  1. FY2026WorsenedAnnual report

    「As natural disasters such as torrential rains have become more severe and frequent in recent years, requirements for developing ground-mounted solar power plants have become stricter, including consideration of hazard conditions and the local environment and consultations with local governments.」

    The disclosure describes the intensification and increasing frequency of torrential rain and other severe weather and the tightening of development requirements as risks relating to weather and natural disasters.
  2. FY2025-H1MaterialisedAnnual report

    「Prolonged heavy snowfall in February, cold waves and unusually low temperatures caused repeated freezing of roads and construction sites, particularly in mountainous areas. This delayed construction and final inspections, and the delivery of properties with sales of approximately ¥2 billion was pushed back to the third quarter or later.」

    Weather-related construction delay risks actually materialised in the form of frozen roads and construction sites caused by heavy snowfall, cold waves and unusually low temperatures, delays in construction and final inspections, and delivery delays involving approximately ¥2 billion.
  3. FY2017MaterialisedAnnual report

    「In the mega-solar business as well, land development work was delayed by prolonged adverse weather and other factors, and projects totalling 3.6MW (2 locations) in the Kyushu region, 1.1MW in the Chugoku region and 1.2MW in the Tohoku region were carried over to the following fiscal year.」

    Although not attributable to a specific event such as a typhoon, delays in land development work caused by prolonged adverse weather occurred, and multiple projects were carried over to the following fiscal year.
  4. FY2016First statedAnnual report

    「However, repeated typhoons in August caused construction delays.」

    The disclosure states that repeated typhoons in August actually caused construction delays.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
No upcoming earnings preview for West Holdings yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.